Fire & Emergency

Gas Leak Response

Gas leak detection, immediate response, evacuation and utility coordination procedures.

Revision 2.1 Updated Apr 19, 2026

Scope and Purpose

This procedure tells every worker what to do when gas is leaking or may be leaking on site: get people out, keep ignition sources away, and call the people who are trained and equipped to stop it.

Covers:

Hazard Identification

  • Fire or explosion when gas reaches an ignition source
  • Gas collecting in buildings, basements, sewers, vaults, trenches and other low or enclosed spaces (propane and some other gases are heavier than air; natural gas rises but can travel through soil and into buildings)
  • Oxygen deficiency (gas displaces air)
  • Toxic gas (H2S, CO, refrigerants, specialty gases)
  • High-pressure release (flying soil, stones, pipe fragments, noise)
  • Cold burns from liquefied gas (propane, refrigerants)
  • A worker tries to stop the leak, rescue someone in the gas, or goes back for tools
  • Ignition from phones, radios, vehicles, tools, light switches, doorbells, electrical panels
  • Traffic and the public walking or driving into the zone
  • Re-entry too early

Required PPE

  • Hard hat, safety glasses, safety footwear, high-visibility clothing.
  • Flame-resistant clothing for work on or next to exposed gas lines (company rule). No clothing that melts (nylon, polyester) as the outer layer.
  • Personal or area gas monitor (LEL, oxygen, and H2S / CO where the assessment lists them) for excavation near gas lines, work in low or enclosed spaces, and propane equipment work.
  • Non-sparking hand tools for tasks next to known gas sources, as the site plan requires.

Key Procedure Steps

Set-up (before work)

  1. Read the site emergency plan.
  2. For excavation: get locates through the one-call service before digging (811 in the US; the provincial one-call service in Canada).
  3. Bump test the gas monitor.
  4. Brief the crew: leak signs, signal, routes, assembly points, numbers, and the "do not" list.

Response: any sign of a leak

  1. Stop work.
  2. Warn everyone by voice or air horn.
  3. Get out upwind.
  4. Company floor distance: move at least 300 ft (90 m) from the leak, or further if responders direct.
  5. Shutoff (designated operator only): close a designated emergency shutoff only if it is on the site plan, it is outside the gas, it is on your way out, and no monitor is alarming at the valve.
  6. If the gas is burning: do not put it out.
  7. Call 911 (or the site emergency number) and the gas utility's emergency line from the assembly point.
  8. Account for everyone at the assembly point using the sign-in sheet or tag board.
  9. Control the perimeter from outside the zone: keep workers, vehicles and the public out.
  10. Meet the responders, give them the SDS for any gas other than natural gas, and the location of the leak and any shutoff already closed.

Close-out

  1. Nobody re-enters the zone until the fire department or gas utility gives the all clear.
  2. Before work resumes, the gas tester tests the work area, nearby low spaces and any excavation: oxygen 19.5% to 23.0%; flammable gas below 10% LEL (company floor); toxic gases below the alarm set points set by the qualified person for each gas from the applicable ceiling, short-term and 8-hour exposure limits; if they are not written down, do not re-enter.
  3. A damaged gas line, coating, tracer wire or locate wire is never backfilled or covered until the utility owner has inspected it, however small the damage (company rule; your state or provincial damage-prevention law may also require reporting it).
  4. Report the incident (section 9) and review the site plan and the cause before the next shift.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • All workers: The site emergency plan: signs of a leak, the alarm, the evacuation routes, assembly points, headcount, how to report, what not to do (1910.38(f); 1926.35(e)(2)-(3); COHSR 17.6(1)).
  • Evacuation helpers / wardens: Designated and trained to help evacuate others (1910.38(e); 1926.35(e)(1)).
  • Designated shutoff operator: Location and operation of each designated shutoff; when not to try.
  • Gas tester: The monitor used: bump test, calibration, alarm set points, testing low spaces and excavations, recording.
  • Supervisor: This SWP, the site plan, calling the utility and 911, headcount, perimeter control, handover to responders, re-entry rules.
  • In-house emergency response team (only if the company has one): A full emergency response program and training for the duties assigned before taking part in any response (US: 1910.120(q)(6)).

Regulatory References

  • 29 CFR 1910.38 Emergency action plans (general industry); 29 CFR 1926.35 Employee emergency action plans (construction).
  • 29 CFR 1910.120(q) and 1926.65(q) Emergency response to hazardous substance releases (only for employers whose employees respond; employers who evacuate and do not let employees assist are exempt with an emergency action plan, (q)(1)).
  • 29 CFR 1926.651(b) Underground installations and (g) Hazardous atmospheres (excavations).
  • 29 CFR 1910.146 Permit-required confined spaces (for entry into low or enclosed spaces; see SWP-002).
  • 29 CFR 1904.39 Reporting fatalities, hospitalizations, amputations and losses of an eye.
  • Canada Labour Code Part II, incl. s.128 (refusal to work).
  • Canada Occupational Health and Safety Regulations SOR/86-304: Part X Hazardous Substances (incl. 10.14 training, 10.20 limits of 50% / 10% of the lower explosive limit, 10.23 warning systems); Part XV Hazardous Occurrence Investigation, Recording and Reporting; Part XVII Safe Occupancy of the Work Place (incl. 17.5 emergency procedures for a leak of a hazardous substance, 17.6 training).
  • Provinces and territories have their own OHS regulations, fire codes and one-call (damage prevention) rules; check the ones that apply to the work site.

Download the Full PDF Template

Get the complete Gas Leak Response document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial