Crane Operations
This procedure covers crane setup, rigging, lifting and load management for all crane types.
Scope and Purpose
This procedure covers rigging and load handling for lifts made with mobile, tower, overhead and boom-type cranes on construction and industrial sites: planning the rig, selecting and inspecting slings and hardware, attaching the load, signalling, guiding and landing the load, and taking rigging out of service.
It does not replace the crane operator's procedures or the crane manufacturer's manual for set-up, assembly/disassembly and operation. It does not cover hoisting people (use a personnel-lifting procedure and plan) or work near power lines beyond the checks below (use SWP Overhead Power Line Safety).
Hazard Identification
- Load drops (sling, hook or hardware failure)
- Load overloads the crane
- Sling cut or damaged on load edges
- Load slips or shifts (unbalanced, wrong hitch)
- Struck by swinging or rotating load
- Pinch / crush between load and structure or between sling and load
- Electrical contact with overhead lines
- Crane tip-over (ground, outriggers, wind, side loading)
- Lost communication between signal person and operator
- Unauthorized people entering the lift area
- Heat, chemicals, cold affecting slings
Required PPE
- Hard hat.
- High-visibility apparel.
- Safety footwear with toe protection.
- Safety glasses.
- Leather or cut-resistant gloves for handling wire rope and rigging.
- Hearing protection where noise requires it.
- Fall protection when rigging at height (follow the Fall Protection SWP).
- Life jacket or PFD when rigging over or near water.
Key Procedure Steps
Plan
- Determine the load weight from a reliable source (manufacturer, shipping papers, drawings and unit weights, or a scale).
- Check the crane's load chart at the actual radius and configuration.
- Prepare a written lift plan, approved by a qualified person, when any of these apply: the load is at or above the company critical-lift trigger (default: 75% of the crane's rated capacity at the planned radius, or a lower figure set by the qualified person); two or more cranes lift together; people are hoisted; the lift is over occupied areas, live process equipment or public space; or the load is unusual in shape, weight distribution or value.
- Check for power lines.
- Pick the rigging: hitch type, sling type, length and number of legs, sling angle, shackles and hooks, all rated for the load and angle.
Set up and inspect
- Barricade the lift area and the hoisting route.
- Inspect every sling, shackle, hook and fitting (Section 10).
- Agree the signal method.
Rig
- Rig over the centre of gravity.
- Pad or protect slings at sharp edges.
- Keep hands and fingers out from between the sling and the load while it is being tightened.
- Do not shorten slings with knots, bolts or makeshift devices.
- Use hooks with self-closing latches (or equivalent) where workers will be in the fall zone.
- Attach tag lines where the load can swing or rotate.
Lift
- Everyone not needed steps out of the fall zone.
- Take up slack slowly.
- Lift and travel the load smoothly.
- Keep the load low and away from people.
- Control the load with tag lines from outside the fall zone.
- If communication between signal person and operator is lost, the operator stops until it is restored.
- Anyone who sees a problem gives the stop signal.
- The operator stays at the controls while a load is suspended.
Land and close out
- Only workers needed to receive the load are in the fall zone while it is landed.
- Land on cribbing so slings can be removed without pulling them from under the load.
- Do not pull a sling out from under a load that is resting on it.
- Unhook.
- Inspect the rigging after use.
- Record any damaged rigging, near misses and lessons learned.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Crane operator
- Rigger: a qualified rigger rigs the load when workers are in the fall zone hooking, unhooking, guiding or making the initial connection, and for assembly/disassembly rigging (US 1926.1425(c)(3), 1926.1404(r)(1)).
- Signal person
- Competent person for sling inspection: designated by the employer (US 1926.251(a)(6), 1910.184(d)).
- Everyone in the lift area: briefed on the lift plan, fall zone, stop signal and this SWP.
- Refresher: Company rule: annual refresher (every 12 months).
Regulatory References
- 29 CFR 1926.251, Rigging equipment for material handling (construction).
- 29 CFR 1910.184, Slings (general industry).
- 29 CFR 1926 Subpart CC, Cranes and Derricks in Construction, including 1926.1401 (definitions), 1926.1404(r) (assembly/disassembly rigging), 1926.1408 (power lines), 1926.1417 (operation), 1926.1419 (signals), 1926.1425 (keeping clear of the load), 1926.1427 (operator qualification), 1926.1428 (signal person qualification).
- Canada Occupational Health and Safety Regulations (SOR/86-304), Part XIV Materials Handling (incl. 14.20, 14.21, 14.23 to 14.27, 14.29, 14.38, 14.39, 14.42, 14.43).
- CSA Z150, Safety Code on Mobile Cranes (referenced by COHSR 14.21).
- Provincially regulated work: follow your province's OHS regulation for cranes, rigging and operator certification.
Download the Full PDF Template
Get the complete Crane Operations document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial