Overhead Power Line Safety
Safe work practices near overhead power lines for construction and material handling operations.
Scope and Purpose
This procedure covers work near overhead power lines by crews who are not line workers. It includes:
It applies whenever any person, tool, material, load or equipment could come within 50 ft (15.2 m) of an overhead line (company trigger).
Hazard Identification
- Boom, mast, load line or load contacting or arcing to a line
- Arcing across the air gap before physical contact
- Dump bodies, excavator and concrete pump booms, drill masts, raised beds
- Long conductive material (ladders, pipe, rebar, siding, scaffold tubes)
- Scaffolds erected, moved or used near lines
- Aerial lifts near lines
- Touch and step potential after contact
- Induced voltage on equipment and loads near transmitters or high-voltage lines
- Line sag and sway (heat, wind, ice), and difficulty judging distance by eye
- Night work, poor visibility
- Downed lines
- Equipment tip-over during evasive moves
Required PPE
- Hard hat
- High-visibility vest
- Safety glasses
- Safety footwear
- Rubber insulating gloves rated for the voltage
- Flame-resistant or arc-rated clothing
Key Procedure Steps
Step 2. Before mobilizing
- Identify all lines.
- Call the utility.
- Plan crane set-up, swing paths, laydown, dump points, parking and scaffold locations so that nothing needs to come inside the clearance distance.
- Plan routes for carrying long material away from lines.
Step 3. Set-up (cranes and hoisting equipment)
- Define the work zone: boundaries the operator will not pass, or 360 degrees to the maximum working radius.
- Check whether any part of the equipment, load line or load could come inside the clearance distance anywhere in the work zone.
- Hold the planning meeting with the operator, spotter and crew: where the lines are, the distance, the measures, the stop signal, and the contact response.
- Install the elevated warning line, barricade or line of signs at the clearance distance, in view of the operator.
- Put in place at least one of: proximity alarm, dedicated spotter, range control warning device, range-limiting device, or insulating link.
- Use nonconductive tag lines only.
- Confirm the electrocution hazard warning is posted in the cab in view of the operator.
- Do not put any part of the equipment, load line or load below a line unless the utility has de-energized and visibly grounded it, or a documented 1926.1408(d)(2) exception applies.
- For crane assembly or disassembly near lines: the same distances apply.
Step 4. Set-up (other equipment, scaffolds, ladders, material)
- Set the Table 2/Table 3 distance for each piece of equipment and scaffold.
- Assign a spotter for any equipment whose boom, bed or mast can rise toward a line (company rule within 50 ft / 15.2 m).
- Use ladders with nonconductive siderails anywhere the worker or ladder could contact energized parts (1926.1053(b)(12)).
- Do not store material, park, or dump under lines where booms, beds, loads or people handling material could reach the clearance distance.
Step 5. During work
- The spotter watches the clearance at every boom position and every lift.
- Ground workers do not touch the equipment, the load line or the load while the equipment is near a line, unless they use protective equipment rated for the voltage or the equipment cannot reach the clearance distance (1910.333(c)(3)(iii)(B)).
- Carry long material low and keep its full length outside the clearance distance.
- Re-check distances when conditions change: wind, heat sag, ice, new equipment, new lift radius.
- Near radio or communication transmitters where a charge can be induced: de-energize the transmitter, or ground the equipment and use nonconductive tag lines (1926.1408(f)).
- Stop work if the clearance cannot be kept.
Step 6. Work closer than Table A (cranes, US) or the Table 2/3 distance
- Do not do this under this SWP alone.
Step 7. Travel under or near lines with no load
- Company rule: travel with the boom or mast lowered and keep the working clearance from Table 1 (cranes) or Table 3 (other equipment).
- Where the route makes that impossible, the supervisor may approve travel at the US minimums.
Step 8. Close-out
- Lower booms and masts before leaving the area.
- Remove warning lines only after all equipment has left the work zone.
- Tell the utility when temporary cover-up or de-energizing is no longer needed.
- Record any near miss, alarm trip or clearance breach and review it at the next briefing.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Crane and hoisting equipment operator, and every crew member assigned to the equipment: Training on: what to do after electrical contact (danger of touching equipment and ground together; stay in the cab unless fire, explosion or other emergency forces exit; safest way to leave; step potential; crew stay away from equipment and load); safe clearance distances; lines presumed energized and uninsulated; limits of insulating links, proximity alarms and range devices; how to ground equipment and the limits of grounding (1926.1408(g)(1)).
- Dedicated spotter: Trained to do the task, including the requirements of 1926.1408 (1926.1408(g)(2)).
- Operators of other equipment (excavators, dump trucks, pumps, drills, aerial lifts): This SWP; the distances in Table 3; contact procedure.
- All workers on site: Location of lines on this site (1926.416(a)(3)); clearance distances; carrying long material; downed line and contact response.
- Supervisor: All of the above, plus how to get voltage information and request utility protection, and the 1926.1410 process.
- Canada federal: Workers near live equipment instructed in the hazard.
Regulatory References
- 29 CFR 1926.1400(c), crane standard exclusions (excavators, backhoes, loaders, concrete pumps).
- 29 CFR 1926.1407, power line safety, assembly/disassembly.
- 29 CFR 1926.1408, power line safety up to 350 kV, including Table A.
- 29 CFR 1926.1409, power line safety over 350 kV.
- 29 CFR 1926.1410, work closer than the Table A zone.
- 29 CFR 1926.1411, traveling under or near power lines with no load, Table T.
- 29 CFR 1926.1427(b)(5), operator retraining; 29 CFR 1926.1428(b), signal person retraining.
- 29 CFR 1926.416(a), protection of employees.
- 29 CFR 1926.600(a)(6), equipment near power lines.
- 29 CFR 1926.451(f)(6), scaffold clearance from power lines.
- 29 CFR 1926.1053(b)(12), nonconductive ladder siderails.
- 29 CFR 1910.333(c)(3), overhead lines (general industry).
- 29 CFR 1910.137(c)(2), Table I-5 (rubber insulating equipment care and test intervals).
- Canada Occupational Health and Safety Regulations, SOR/86-304, Part VIII: 8.5, 8.6, 8.8 and the Schedule; 12.11.
Download the Full PDF Template
Get the complete Overhead Power Line Safety document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial