Pipe Laying in Trenches
Underground pipe installation in open-cut trenches with material handling and grade control.
Scope and Purpose
This procedure covers installing underground pipe (water, sewer, storm drain, conduit and similar) in open-cut trenches: stringing and storing pipe at the trench, lowering it in, bedding, jointing, cutting, testing and initial backfill. Pipe laying puts workers in a trench under moving loads, so it combines cave-in, struck-by and caught-between hazards.
Hazard Identification
- Cave-in
- Struck by pipe being lowered; pipe dropped
- Caught between pipe and trench wall, box wall or previously laid pipe
- Machine overloaded or tipping at reach
- Pipe or materials rolling or falling into the trench
- Box shifted or lifted with people inside; digging too deep below the box
- Stored pressure during testing (plug or cap ejected, pipe or fitting moves)
- Joint pushing and pulling (bars, come-alongs, jointing tools)
- Silica dust (cutting concrete or cement-lined pipe)
- Asbestos fibres (asbestos cement pipe)
- Laser light (pipe laser)
- Manual handling of pipe, fittings and bedding
- Hazardous atmosphere (sewer tie-ins, contaminated ground, engine exhaust)
- Flooding from a live main, sewer or groundwater
- Contaminated soil or water
- Noise from saws and equipment
Required PPE
- Hard hat. US: ANSI Z89.1 (1926.100). Canada federal: CSA Z94.1 or ANSI Z89.1 (COHSR 12.1).
- Safety footwear with toe protection (Canada federal: CSA Z195, COHSR 12.11).
- Safety glasses (US 1926.102; Canada federal: CSA Z94.3, COHSR 12.12). Face shield over glasses when cutting.
- High-visibility apparel. US: when exposed to public vehicle traffic (1926.651(d)). Canada federal: CSA Z96 where there is a risk from moving vehicles (COHSR 12.17). Company floor: everyone on site; Class 2 minimum near traffic (as SWP-061).
- Work gloves suited to pipe handling.
- Hearing protection when cutting or near loud equipment.
- Respiratory protection: APF 10 or higher for handheld saw cutting of concrete or cement-lined pipe in a trench (company rule, PL-F); otherwise per the assessment, under the respiratory protection program.
- Laser eye protection only where the laser maker or the assessment calls for it (US 1926.54(c)).
Key Procedure Steps
Prepare
- Complete the SWP-005 / SWP-061 checks.
- Confirm the trench width, grade and alignment match the drawings, and that the box or shoring leaves room for the pipe and the crew inside the protected area.
- String and stockpile pipe on level ground, chocked, at least 1 m (3.3 ft) from the edge (company floor), and where the machine can reach it without swinging over the crew.
- Place ladders inside the protected area so no worker travels more than 25 ft (7.62 m) to get out (US 1926.651(c)(2)).
- Test the air before every entry at 4 ft (1.22 m) or more and keep a monitor running while anyone is inside (SWP-061 company rule).
- Place and grade the bedding from inside the protected area.
Rig and lift
- Inspect slings and lifting attachments before use each day (US 1926.251(a)(6), competent person); remove damaged items from service.
- Excavators and backhoes: lift only from the manufacturer's lifting point, inside the lift chart at that radius, with the machine in its lifting mode and with any load-holding feature the manufacturer requires (company rule).
- Sidebooms (pipelayers) are Subpart CC equipment in the US (1926.1440).
- Use rated slings, pipe hooks or clamps suited to the pipe.
- Canada federal: post signs or have a signaller at the approaches to the lifting area; only people essential to the work enter; stop lifting near anyone who enters without authority (COHSR 14.38).
Lower and place
- Everyone stands clear of the landing zone and out from between the pipe and any wall while the pipe is lowered.
- The operator takes signals only from the designated signal person and obeys a stop signal from anyone (COHSR 14.26(2), (3)).
- Lower the pipe slowly and hold it just above the bedding (company rule).
- Use a tag line or guide pole from a protected position if the pipe swings.
- Set the pipe on the bedding.
- Lower fittings, valves and bedding material only when the crew is clear of the landing spot (as SWP-062).
Join
- Clean, lubricate and seat gaskets per the pipe maker.
- Keep joint deflection within the pipe maker's limits.
- Cut pipe with the tool the pipe maker specifies.
- Pipe laser: only trained, qualified people set up and adjust it; post the laser warning placard; never aim the beam at people; shutter or switch it off when not needed and when left unattended at breaks, shift change or overnight (US 1926.54).
Work in the box
- Work only inside the box or shored length.
- Do not dig more than 2 ft (0.61 m) below the bottom of the box or shoring, and only if it is rated for the full trench depth and there is no sign of soil loss from behind or below (US 1926.652(e)(2)(i), (g)(2)).
- Everyone out of the box before it is installed, removed, lifted or moved (US 1926.652(g)(1)(iv); company rule extends this to any move).
- Do not stand on, climb on, or hang loads from braces, cylinders or spreaders, and lower pipe past them without striking them (as SWP-063).
Tie-ins
- Live sewers: plug or bypass flow first; test the atmosphere; anyone entering a manhole or the pipe follows SWP-002.
- Live water mains: owner isolates and drains; keep pumps and an exit ready for unexpected flow.
- Gas lines: tie-ins only by the gas owner's qualified crew.
Haunch, test and initial backfill
- Place haunch material and work it under the pipe barrel to the springline.
- Hand-place and tamp initial backfill to the depth the specification sets over the crown; company default where the specification is silent: 12 in (300 mm) (company rule).
- Pressure and air tests (company rules): install thrust restraint, plugs and caps per the specification and the maker, braced or restrained; set the test area; nobody in the trench, box or manhole in line with a plugged or capped end while it is under pressure; pressurize and bleed down from outside the trench; release all pressure and confirm the gauge reads zero before anyone approaches a plug or cap.
- Complete joint inspection, testing and any camera inspection before final backfill.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Pipe layer: This SWP and SWP-061: protected area, landing zone and caught-between rules, egress, signs of distress, gas alarms, test area rules.
- Excavator operator lifting pipe: Trained on the machine's lifting mode, lift chart and lifting point; signals; trench setbacks.
- Sideboom (pipelayer) operator: US: Subpart CC applies to sideboom cranes, except operator certification (1926.1440(a)); operator qualification per ASME B30.14 as 1926.1440(c) incorporates.
- Signal person: Knows the signals for the machine in use.
- Competent person (US) / qualified person (Canada federal): As SWP-061, plus sling and lifting attachment inspection.
- Laser operator: Trained and qualified on the laser in use; proof of qualification carried (US 1926.54(a), (b)).
- Pressure test lead: The test procedure in the specification, the plug and cap maker's instructions, and the Section 8 test rules.
Regulatory References
- 29 CFR 1926 Subpart P: 1926.650; 1926.651 ((c)(2) egress, (d) traffic, (e) falling loads, (h) water, (j) loose rock and spoil, (k) inspections); 1926.652 ((e)(2) support systems, (g) shields).
- 29 CFR 1926.251 (rigging equipment for material handling); 1926.1400(c)(2) (excavators excluded from Subpart CC); 1926.1440 (sideboom cranes).
- 29 CFR 1926.54 (lasers); 1926.1153 (silica, Table 1); 1926.1101 (asbestos).
- 29 CFR 1926.21(b)(2) (training); 1926.52, 1926.100, 1926.101, 1926.102 (PPE); 1926.1053(b)(1) (ladders).
- 29 CFR 1904.39 (reporting).
- COHSR SOR/86-304: Part III (3.11 portable ladders, 3.12 excavation), Part X (10.19 exposure limits, 10.26 lasers, 10.26.1 onward asbestos), Part XI (confined spaces), Part XII (PPE), Part XIV (14.23 training, 14.26 and 14.27 signals, 14.38 materials handling area, 14.39 hazard areas, 14.46 and 14.48 manual handling), Part XV (reporting), Part XIX (19.6 training).
- Provincially regulated work: follow your province's excavation, rigging and asbestos rules.
Download the Full PDF Template
Get the complete Pipe Laying in Trenches document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial