Traffic Control and Flagging

Traffic control and flagging procedures per MUTCD for construction work zones.

Rev 02 Updated Apr 19, 2026

What This Procedure Covers

  1. Approve the traffic-control arrangement

    For trained traffic-control crews using an approved site plan. Confirm the road authority, applicable traffic-control manual and local supplements. This form records implementation; it does not replace a designed traffic-control plan or flagger training and certification.

    Plan for every road user and the workers inside the site: Include motorists, pedestrians, cyclists, accessible routes, property access and emergency vehicles. Coordinate public traffic controls with an internal plan for construction vehicles and people on foot. Brief the work sequence, alarm, escape routes and stop-work authority before installation begins.

  2. Install and inspect the work zone

    Use the approved sequence and protective measures for setting out, changing and removing devices. Confirm warning signs, tapers, buffers, lane widths and barriers against the actual road conditions. Do not improvise a closure, speed limit or barrier arrangement.

    Position for visibility and escape: Select stations so approaching drivers can stop before the intended stopping point. Account for speed, curves, grades, weather and queues rather than a universal 500-foot distance. Start from the shoulder or closed lane, clear of moving traffic; maintain visibility and an unobstructed escape route. Keep buffer space clear of work, stored materials and parked equipment. Inspect from the road user perspective before the operation starts and after changes. Escalate inadequate sight distance or queues extending beyond the protected approach; obtain a revised arrangement rather than moving devices casually.

  3. Coordinate flaggers before releasing traffic

    Assign a lead and establish positive communication between stations. Verify the route is clear before releasing a direction of traffic. Account for driveways, side roads, workers and construction equipment entering the controlled section.

    Keep STOP, PROCEED and SLOW signals distinct: Under the MUTCD paddle method, face approaching traffic and keep the paddle stationary. To stop, show STOP with the free hand raised toward drivers. To release stopped traffic, show SLOW and motion to proceed with the free hand. To slow approaching traffic, show SLOW; a palm-down up-and-down motion may reinforce slowing. Do not wave the paddle or improvise conflicting gestures. If communication or route clearance is lost, do not release opposing traffic into uncertainty; use the agreed safe hold and escalation plan. Do not attempt to stop a non-compliant driver with your body. Warn workers and use the escape route if threatened.

  4. Maintain visibility and attention

    Use high-visibility apparel and other PPE that meet the applicable authority requirements and site assessment. Keep garments and devices clean and visible; check fit over weather clothing. Provide trained relief for breaks, fatigue and changing conditions.

    Night work needs a visible station, not just a reflective vest: Illuminate flagger stations for planned night work and use the required retroreflective devices. Check the view from each approach for glare, shadows and obstruction. Stop or modify operations when fog, rain, darkness or a failed light prevents drivers from recognizing the controls in time. Stay focused on traffic. Avoid personal phone use, earbuds and conversations that distract from the task. Remain separate from the work crew and parked equipment. Hand over control to a trained replacement before an ordinary break; immediate danger takes priority over remaining at a station.

  5. Control construction vehicles and incidents

    Use designated plant routes, delivery points and pedestrian paths within the work zone. Reduce reversing where practicable and keep people out of blind spots. Brief delivery drivers before they enter; public traffic signs alone do not control vehicle movement inside the work area.

    Act on an intrusion or failure without creating another conflict: Use the agreed alarm to warn workers and other flaggers. Get clear of an errant vehicle and contact the supervisor or emergency services from safety. Do not pursue or argue with the driver. Coordinate emergency access before releasing traffic; do not direct vehicles toward responders or a blocked section. Record unsafe queues, near misses, damaged devices and changes in traffic or work conditions. Reinspect and brief the revised plan before restarting. Use the authority-approved removal sequence when work ends and restore the intended traffic pattern before withdrawing protection.

  6. Shift inspection and handover

    Record the controls checked, deficiencies corrected and any remaining restrictions. Confirm responsibility for overnight devices or ongoing closures. Retain approvals, inspection records, incident reports and plan revisions together.

Reference guidance: FHWA MUTCD Part 6; Iowa DOT flagger training; NIOSH internal traffic-control plans and work-zone guidance; OSHA backover prevention. Apply the locally adopted manual, road-authority requirements and approved plan.

Download the Full PDF Template

Get the complete Traffic Control and Flagging document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial