Concrete Pump Truck

Concrete pump truck operation including pipeline safety, blockage response and power line awareness.

Rev 02 Updated Jun 19, 2026

What This Procedure Covers

  1. Plan the pump and placement operation

    For competent operators and the placement crew using truck-mounted boom or line pumps. Use equipment-specific operating, pressure-release and cleaning instructions. Confirm operator certification or supervised-training requirements for the jurisdiction and pump type.

    Brief every crew before delivery starts: Identify the pump operator, placement lead, hose handlers and delivery contact. Agree signals, a stop command, exclusion boundaries and emergency communications. Stop pumping when communication is lost or someone enters a hazardous area.

  2. Approve the setup and support conditions

    Assess ground bearing capacity, underground services, voids, excavation edges and vehicle access before positioning. Use the required competent assessment to select the support arrangement and bearing materials.

    Use only an authorized equipment configuration: Deploy outriggers according to the machine instructions and approved setup. Partial deployment is not an improvised space-saving option; it requires a manufacturer-permitted configuration and the associated restrictions. Do not bypass stability controls or exceed the permitted operating envelope. Account for overhead electrical hazards during setup, unfolding, pumping and folding. Establish required utility coordination and approach controls before movement. Watch for settlement or changed ground conditions during use and stop if stability is in doubt.

  3. Inspect the pump and delivery system

    Verify current inspections and service records, then perform the required pre-use checks. Inspect boom components, hydraulics, controls and the emergency-stop functions under the manufacturer method.

    Keep incompatible or worn components out of service: Use compatible components rated for the configured system. Check coupling security, supports and the hose arrangement against the instructions. Remove damaged or excessively worn parts from service. Do not add unapproved hose extensions, end fittings or attachments. Keep hopper guards and safety devices functional. Never reach into moving equipment or defeat an interlock. Cleaning, adjustment and servicing require the separate equipment-specific safe-state procedure; stopping normal pumping is not proof that all hazards are controlled.

  4. Coordinate startup, placement and restart

    Follow the approved priming and startup method for the concrete and delivery system. Warn the crew before starting or restarting and keep people clear of the discharge and hose movement area until the operator releases it.

    Control hose-whip exposure: Trapped air and interrupted flow can cause violent hose movement. Maintain the operating conditions required by the instructions and stop for abnormal flow, suspected blockage or air entry. Do not look into a delivery line or allow people to stand in the discharge path. Never increase pressure to force an obstruction through. Do not open couplings or attempt a blockage clearance until the authorized operator has followed the prescribed pressure-release and verification process. Keep the crew clear; residual pressure can remain despite an apparently stopped pump.

  5. Clean using a separate approved method

    Plan cleaning before the pour. Use the manufacturer-approved method and trained personnel, with a controlled discharge area and containment. Compressed-air cleaning introduces severe stored-energy and projectile hazards and is not a routine interchangeable option.

    Keep placement workers away from cleaning hazards: Do not improvise a compressed-air arrangement or send a cleaning device through an unapproved hose configuration. Use the required equipment, restraints and controls from the approved cleaning procedure. Keep personnel outside the danger area until the responsible operator confirms it is safe. Wash wet concrete from exposed skin promptly and remove contaminated clothing; water washing is not a chemical-neutralization process. Follow the product SDS and first-aid arrangements. Collect washwater and solids in approved containment, not in an unassessed pit or storm drain.

  6. Stow, inspect and hand over

    Follow the machine-specific sequence for boom stowing, support retraction and transport preparation. Confirm the equipment is secure and the route clear before moving. Record damage, faults and restrictions for the next operator.

Reference guidance: WorkSafeBC Concrete Pumpers; Safe Work Australia concrete-pumping guide; ACPA hose-whip and clean-out bulletins; Putzmeister safety manual. Complete with local rules and exact equipment instructions.

Download the Full PDF Template

Get the complete Concrete Pump Truck document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial