Boom Truck / Picker Truck

Boom truck and picker truck lifting operations with outrigger setup, load charts and rigging.

Revision 2.1 Updated Apr 19, 2026

Scope and Purpose

This procedure covers setting up, operating and shutting down truck-mounted hydraulic cranes (boom trucks and picker trucks) for loading, unloading, placing material and other lifts on construction and industrial sites. It covers both types:

This SWP applies to all boom truck work as a company rule, including work that a regulation excludes (see the table).

Hazard Identification

  • Tip-over from overload (load heavier than thought, radius longer than planned)
  • Tip-over from outrigger set-up (not extended per chart, ground failure, voids)
  • Contact with or arcing from overhead power lines
  • Struck by falling load (rigging, hook or two-block failure)
  • Struck or crushed by rotating crane or swinging load
  • Crushed by outrigger beams or floats
  • Side loading / dragging (boom failure, tip-over)
  • Boom contact with structures or obstructions
  • Hydraulic failure or high-pressure fluid injection
  • Falls from the truck deck or load
  • Wind, lightning, ice, poor visibility
  • Lost or unclear signals
  • Unauthorized people or traffic entering the work area
  • Truck rolls away or moves during the lift
  • Fire
  • Pinch and crush while hooking or landing

Required PPE

  • Hard hat (meeting ANSI/ISEA Z89.1 or CSA Z94.1 as your jurisdiction requires).
  • High-visibility apparel. Company minimum: Class 2 (ANSI/ISEA 107 or CSA Z96, as your jurisdiction requires).
  • Safety footwear with toe protection.
  • Safety glasses.
  • Leather or cut-resistant gloves for rigging and handling loads.
  • Hearing protection where noise requires it.
  • Fall protection when working on the deck or load at 4 ft (1.2 m) or more (company floor; Fall Protection SWP-004).
  • Non-conductive tag lines near power lines (equipment, not PPE, but required: Section 8).

Key Procedure Steps

Plan

  1. Get the load weight from a reliable source: manufacturer, shipping papers, drawings and unit weights, or a scale.
  2. Check the load chart at the longest radius you will use, for the boom length and outrigger set-up you will have.
  3. Prepare a written lift plan, approved by a qualified person, when any of these apply: the load is at or above 75% of
  4. Power lines.
  5. Ask the site controlling contractor about buried utilities, voids, tanks and fill under the set-up area.

Arrive and set up

  1. Drive to the set-up position with the boom stowed and secured and outriggers stowed.
  2. Barricade or mark the swing radius and the fall zone.
  3. Set the parking brake and chock the wheels (company rule).
  4. Place mats or cribbing under every float (company floor).
  5. Extend each outrigger fully, or to a position shown on the load chart.
  6. Level the truck within the manufacturer's tolerance.
  7. Do the shift inspection, or confirm the competent person has (Section 10).
  8. Agree the signal method.

Lift

  1. Before starting the engine, confirm all controls are in neutral and everyone is clear.
  2. Confirm the load weight with the operator.
  3. Everyone not needed steps out of the fall zone and swing radius.
  4. Take up slack slowly.
  5. Lift vertically.
  6. Swing slowly so the load does not swing out beyond control.
  7. Before a worker goes where the operator cannot see them inside the swing radius, the operator is told.
  8. Keep at least two full wraps of rope on the drum (winch-equipped trucks).
  9. If the LMI / RCI / AOPD warns or cuts out: stop, then reduce the radius or lower the load.
  10. If signals are lost or unclear: stop.
  11. The operator stays at the controls whenever a load is on the hook (company rule).
  12. Do not travel with a suspended load unless the manufacturer allows it and a competent person plans the route, speed
  13. Stop and lower the load if wind, ice or snow exceed the limits set by the manufacturer or the competent person, if

Land and close out

  1. Only workers needed to receive the load are in the fall zone while it lands.
  2. Stow and secure the hook and boom per the manufacturer.
  3. Raise outriggers, keeping them in view; stow floats and mats.
  4. Remove chocks only when the boom and outriggers are stowed.
  5. Record operating hours, defects and repairs needed.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • Operator, US construction: Trained, certified or licensed, and evaluated by the employer before operating, except equipment rated 2,000 lb or less (1926.1427(a)).
  • Operator, Canada federal: Instructed and trained in inspection, fuelling and safe use per the manufacturer and site conditions (COHSR 14.23(1)); training recorded and kept while employed (14.23(4)); provincial operator's licence where the province requires one (14.24).
  • Operator, excluded delivery work (US 1926.1400(c)(17)) or other jurisdictions: Company rule: trained on this make and model and evaluated by the employer, documented.
  • Qualified rigger: Qualified person criteria; rigging training per SWP-006.
  • Signal person: US: qualified by a third-party or employer qualified evaluator, oral or written test and practical test, documentation on site listing each signal type (1926.1428(a), (c)).
  • Dedicated spotter (power lines): Meets signal person qualification and is trained for the task (1926.1401, 1926.1408(g)(2)).
  • Operator and crew (power lines): Trained in: contact procedures; danger of touching the truck and ground at the same time; stay in the cab unless fire, explosion or other emergency; safest way to leave; step potential; crew stays away from the truck and load; clearance distances; lines presumed energized and uninsulated; limits of alarms and range devices; grounding limits (1926.1408(g)).
  • Everyone working near the truck: Trained to recognize swing radius and crush hazards and to stay clear (1926.1424(a)(2)(i), 1926.1430(e)); briefed on this SWP and the lift.
  • Competent / qualified person (inspections): Trained in the Subpart CC requirements for their role (1926.1430(d)); Canada federal: qualified person per COHSR 14.20(3).

Regulatory References

  • 29 CFR 1926 Subpart CC, Cranes and Derricks in Construction: 1926.1400 (scope and exclusions), 1926.1401
  • 29 CFR 1904.39 (reporting to OSHA).
  • COHSR SOR/86-304, Part XIV Materials Handling: 14.1, 14.2, 14.12, 14.16, 14.20, 14.21, 14.23 to 14.27, 14.38, 14.39,
  • CSA Z150, Safety Code on Mobile Cranes (referenced by COHSR 14.21).
  • Provincially regulated work: your province's OHS regulation for cranes and operator licensing.

Download the Full PDF Template

Get the complete Boom Truck / Picker Truck document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial