This procedure covers structural demolition including mechanical, manual and controlled demolition methods.
Scope and Purpose
This procedure sets out how to plan, prepare and carry out the demolition of a building or structure, in whole or in part, so that nothing collapses that was not meant to, and nobody is exposed to hidden hazards in the building.
Covers:
Hazard Identification
- Unplanned collapse of the structure or part of it
- Structure damaged by fire, flood, explosion or other cause
- Live utilities (electric, gas, water, steam, sewer, telecom)
- Hazardous chemicals, gases, fuels or flammables in pipes, tanks or equipment
- Asbestos, lead, PCBs, mercury, mould and other hazardous building materials
- Silica and other dust
- Falls through floor openings, wall openings, open edges and stairwells
- Falling debris and material drops
- Chute failure or falling into a chute
- Overloaded floors (debris, equipment, masonry falling in masses)
- Manual floor removal (floor arches)
- Walls, masonry sections and chimneys
- Mechanical demolition: struck-by, flying debris, machine falling or tipping
- Demolition ball and clamshell
- Steel removal
- Glass
- Stairs, passageways, ladders
- Fire (cutting, hot work, fuels, debris)
- Noise and vibration
- Public and neighbours
Required PPE
- Hard hat (Class/Type as your jurisdiction requires).
- Safety glasses with side shields; goggles or face shield for breaking, cutting and chipping.
- Safety footwear with puncture-resistant soles.
- High-visibility apparel.
- Work gloves; cut-resistant gloves for glass, sheet metal and rebar.
- Hearing protection where noise assessment requires it.
- Respiratory protection selected for the dust, fumes or fibres in the survey and exposure plan, used under the employer's respiratory protection program (fit-tested where required).
- Fall protection (full-body harness, connector, anchorage) at 4 ft (1.2 m) or more and at open edges, per SWP-004.
- Hot work: flame-resistant clothing, welding or cutting eye and face protection.
- Asbestos and lead work: the PPE in the abatement procedure, not this SWP.
Key Procedure Steps
Plan and prepare
- Competent person makes the engineering survey of the structure and any adjacent structure where workers may be exposed.
- Get the owner's asbestos and hazardous materials information.
- Prepare the written demolition plan: method, sequence, equipment, shoring, debris route, chutes, drop areas, exclusion zones, fall protection and emergency plan.
- Arrange with each utility to shut off, cap or control every service outside the building line.
- Find out what chemicals, fuels or gases were used in pipes, tanks and equipment.
- Shore or brace any fire, flood or explosion-damaged part before anyone goes in.
Set up
- Fence the site and set the exclusion zones.
- Designate the stairs, passageways and ladders to be used.
- Remove glass that can break and fall.
- Cover floor openings not used for drops.
- Install chutes, or barricade drop areas below floor holes and post signs at each level.
Strip-out
- Remove non-structural items, fixtures, finishes and loose materials first, in the order in the plan.
- Do not cut or remove any structural or load-bearing member during strip-out unless the plan allows it and the competent person agrees (floor beams may be cut only for disposal openings or equipment installation, within the floor-opening and floor-arch rules).
Structural demolition
- Work from the top down.
- Do not cut or remove load-bearing members on any floor until all storeys above have been demolished and removed.
- Keep disposal openings in a floor to no more than 25 percent of the total floor area unless the lateral supports of the removed flooring stay in place.
- Do not let masonry fall onto floors in masses that exceed the floor's capacity.
- Do not leave a wall more than one storey high standing alone without lateral bracing unless it was designed to stand alone and is in safe condition.
- Floor arches: clear debris from the arch and 20 ft around it.
- Steel: dismantle column length by column length and tier by tier.
- Mechanical demolition: keep the machine on ground or floors proven to carry it.
- Competent person inspects continuously as work progresses.
- Dust control: use wet methods (water) whenever dust is made, unless water creates a greater hazard (electrical, freezing).
Close-out
- Leave the structure stable at the end of each shift: walls braced or brought down, openings covered, equipment parked away from edges and openings.
- Remove debris to licensed or approved disposal facilities with the required records.
- At the end of the job, confirm services stay capped, backfill or barricade any openings and basements, and remove barricades only when nothing can fall.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Demolition worker: Recognition and avoidance of unsafe conditions and the rules that apply to this work (US 1926.21(b)(2)); this SWP and the demolition plan; fall protection (SWP-004); hazard communication for materials in the survey; silica, lead or asbestos awareness where present (US 1926.1153, 1926.62, 1926.1101; Canada federal asbestos education and training program, COHSR 10.26.2(f)).
- Equipment operator: Trained and evaluated on the specific machine and attachment; this SWP and the demolition plan.
- Competent person (US) / qualified person (Canada federal): Experience in demolition and structural assessment; able to make the engineering survey, read structural drawings and the hazardous materials survey; appointed in writing by the employer (company rule).
- Chute gate tender / spotter: Chute operation, truck loading, exclusion zone control, signals.
- Abatement workers: Training and any licence or certificate your jurisdiction requires for asbestos or lead work (not covered by this SWP).
Regulatory References
- US OSHA 29 CFR 1926 Subpart T: 1926.850 (preparatory operations), 1926.851 (stairs, passageways, ladders), 1926.852 (chutes), 1926.853 (removal through floor openings), 1926.854 (walls, masonry, chimneys), 1926.855 (manual removal of floors), 1926.856 (removal with equipment), 1926.857 (storage), 1926.858 (steel), 1926.859 (mechanical demolition), 1926.860 (explosives: Subpart U).
- US OSHA 29 CFR 1926.21(b)(2) (training), 1926.252 (disposal of waste materials), 1926.501 and 1926.502 (fall protection), 1926.1427 (crane operator qualification).
- US OSHA 29 CFR 1926.1101 (asbestos), 1926.62 (lead), 1926.1153 (respirable crystalline silica), 1926.52 (noise). Named; follow the full standard where the material is present.
- US OSHA 29 CFR 1904.39, Reporting fatalities, hospitalizations, amputations and losses of an eye.
- Canada: COHSR SOR/86-304, Part II s. 2.14 (housekeeping), Part X ss. 10.4, 10.26.1 to 10.26.11 (hazard investigation, asbestos), Part XII ss. 12.06, 12.07, 12.2, 12.21 (fall protection, training, records), Part XV (reporting) (federally regulated workplaces).
- CSA S350 (demolition of structures), ANSI/ASSP A10.6 (demolition). Named only; check the edition your jurisdiction requires.
- Provincial OHS regulations and local demolition permits. Use the ones for your location.
Download the Full PDF Template
Get the complete Demolition Safety Procedure document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial