0
Power Tools

Drill Press Operation

Drill press operation including workpiece securing, speed selection and entanglement prevention.

Rev 02 Updated Apr 19, 2026

What This Procedure Covers

  1. Scope and authorization

    Complete for the actual drill press, tooling and material. Tapping, milling, sanding and other attachments are excluded unless separately assessed and approved by the equipment instructions and site procedure.

    Identify the main hazards: Plan controls for rotating chuck and tooling, spinning workpieces, hot or sharp chips and trapped fingers. Keep hair contained and remove jewellery and loose clothing. Do not wear gloves where they can contact the rotating drill or chuck.

  2. Inspect guards and establish the setup

    Use the approved energy-control arrangements before changing tooling, accessing drives or making exposed adjustments. Do not change belt positions with the machine running.

    Set the required speed correctly: Select the speed for the tool diameter, material and operation using approved data. Set it by the method specified for this machine. Do not assume every drill press starts at a low speed and is then adjusted while running; drive designs differ. Restore drive guards before operation. Check the correct tooling is securely held and remove the chuck key and adjustment tools immediately. Keep a defective guard, control or chuck out of use until repaired and released.

  3. Clamp and support the work

    Use a suitable vise, clamp or fixture to prevent rotation and lifting. Secure the holding device to the table as the task requires. Never rely on your hand to resist drilling torque.

    Prepare the hole: Use marking, pilot drilling and backing appropriate to the material and tooling. A universal pilot-hole diameter rule does not suit every drill or task. Confirm the drill cannot strike the table, clamp or hidden obstruction at full intended travel. Plan any lubricant application without reaching into rotating parts. Do not introduce a fluid that is incompatible with the material, electrical arrangement or machine instructions.

  4. Drill, clear chips and stop

    Check the area is clear, guards are positioned and the chuck key is removed before starting. Use the prescribed feed without forcing the tool. Manage breakthrough and deep-hole chip clearing using the approved method.

    Keep clear of rotation: Do not touch or attempt to slow the chuck or spindle by hand. Do not adjust, measure or reposition the work while it is moving. Stop and wait for rotation to cease before removing chips with the suitable brush or tool; never clear swarf with bare hands.

    If the work shifts or the tool binds: Stop safely and keep clear of a spinning workpiece. Do not grab it. Wait for movement to stop and apply the required energy-control arrangements before resolving the cause. Recheck clamping, tooling and settings before authorized restart.

  5. Shutdown and records

    Stop the spindle completely before leaving or unloading. Control hot and sharp material. Clean using the approved method and follow the manual for tooling removal, storage and maintenance.

Reference guidance: CCOHS Metalworking Machines / Drill Presses; OSHA Drill Presses and point-of-operation guard interpretation (1990-10-15). Complete with actual machine and tooling instructions before approval.

Download the Full PDF Template

Get the complete Drill Press Operation document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial