0
Excavation & Trenching

Emergency Trench Rescue

Emergency response procedures for trench collapse and buried worker rescue operations.

Revision 2.1 Updated Apr 19, 2026

Scope and Purpose

This procedure tells the site crew what to do when a worker is trapped, buried or injured in a trench or excavation, and what must be in place before trench work starts so that help arrives fast.

Site rule: workers who are not trained trench rescue technicians never enter a collapsed trench to rescue anyone, and stay back from the edge. Call trained responders. A second collapse can bury the rescuer too.

Hazard Identification

  • Secondary collapse
  • Surcharge loads at the edge (spoil, materials, machines, vehicles)
  • Vibration (running engines, compactors, traffic)
  • Suffocation and crush injury of the trapped worker
  • Water entering the trench
  • Hazardous atmosphere (oxygen deficiency, gas from a struck line, engine exhaust, landfill or sewer gas)
  • Struck utilities (gas, electric, water, sewer)
  • Falling into the trench at the edge
  • Traffic at the site entrance and work zone
  • Darkness or bad weather
  • Rescuer exhaustion, heat or cold
  • Psychological trauma

Required PPE

  • Hard hat.
  • High-visibility vest or garment (required in the US when exposed to public vehicle traffic).
  • Safety footwear.
  • Safety glasses.
  • Work gloves.

Key Procedure Steps

Phase 1: First minute

  1. Shout the alarm.
  2. Call 911 (or the site emergency number).
  3. Nobody enters the trench.
  4. Shut down engines, compactors and other vibrating equipment near the trench.
  5. Move everyone back from the edge and set an exclusion zone.
  6. Count every worker against the sign-in sheet.

Phase 2: Until responders arrive

  1. Write down the time of collapse and the worker's last known position.
  2. If the worker is conscious, talk to them from a safe distance back from the edge.
  3. Do not dig, pull on the worker, or move spoil, materials or machines near the edge.
  4. If a utility was struck: call the utility owner; keep people away; no smoking, engines or other ignition sources if gas is suspected.
  5. Send a guide to the site entrance.
  6. Collect for the incident commander: trench depth and length, soil type, the protective system design or manufacturer's tabulated data, utility locate sheets, and SDS for any chemicals involved.
  7. Have resources ready but do not deploy them: plywood, timber, shoring or shield panels, pumps, lighting, a vacuum truck if available.

Phase 3: Rescue (trained rescue team only)

  1. On arrival, the supervisor briefs the incident commander and hands over.
  2. Only trained rescue technicians enter, and only after the rescue team has protected the area with rescue shoring and tested the atmosphere.
  3. Site operators run equipment only when the incident commander asks and the operator agrees it can be done safely.

Phase 4: After the rescue

  1. Tell EMS how long the worker was trapped and how much of the body was buried.
  2. Keep the excavation closed.
  3. Preserve the scene for investigators.
  4. Report the incident (see section 9).
  5. Investigate: soil classification, protective system, inspections, water, surcharge loads, what the competent person saw and did.
  6. Debrief the crew and offer support to everyone involved.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • All trench / excavation workers: This procedure: the stay-out rule, how to call 911, what to tell the dispatcher, how to account for workers, signs of a cave-in, exits in their trench.
  • Competent person / supervisor: Excavation competent person training (soil, protective systems, inspections); this procedure; running the scene until responders arrive.
  • First aider: First aid and CPR certificate to the level required by your jurisdiction and site.
  • Trench rescue team: Trench rescue training and equipment.

Regulatory References

  • US OSHA 29 CFR 1926 Subpart P, Excavations: 1926.650 (definitions), 1926.651 (specific excavation requirements, incl. (c)(2) egress, (g) hazardous atmospheres and emergency rescue equipment, (k) inspections), 1926.652 (protective systems).
  • US OSHA 29 CFR 1904.39, Reporting fatalities, hospitalizations, amputations and losses of an eye.
  • Canada: COHSR SOR/86-304 Part III s. 3.12 (Excavation) and Part XV (Hazardous Occurrence Investigation, Recording and Reporting), for federally regulated workplaces.
  • Provincial OHS regulations each have excavation and trenching requirements. Use the one for your province.
  • For rescue team qualification (named for reference, not quoted): NFPA 1006, Standard for Technical Rescue Personnel Professional Qualifications; NFPA 1670 (technical search and rescue operations and training) or the NFPA standard that has replaced it. Confirm the current edition with your rescue provider.

Download the Full PDF Template

Get the complete Emergency Trench Rescue document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial