Barge Operations
Barge construction operations including mooring, load stability and crane operations.
Scope and Purpose
This procedure covers construction, maintenance and material handling work done from deck barges, spud barges, crane barges and floats while they are moored, spudded or anchored at the work site: getting on and off, mooring and tending lines, loading and deck load stability, cranes on barges, moving people to and from the barge, and barge emergencies.
It does NOT cover: towing and navigating the barge (done by the towboat or vessel operator under their own marine rules); diving (SWP-111); general water edge rules, life jackets and man-overboard (SWP-109, which applies on every barge); rigging (SWP-006); fall protection systems (SWP-004); entry into barge voids, holds or tanks (follow the Confined Space SWP, SWP-002).
Hazard Identification
- Barge capsizes, lists or sinks from overloading, uneven load or flooding
- Crane tips or barge lists under a lift
- Crane shifts on deck
- Struck or crushed by crane superstructure
- Crushed in the pinch zone between barge and dock / vessel / barge
- Falling into the water
- Falls on deck or into holds / hatches
- Unsafe access (gangway, ramp, ladder)
- Mooring line or tow line parting (snap-back)
- Load shifts on deck
- Weather, waves, current, passing wakes
- Fire on deck (fuel, hot work)
- Confined space (voids, rakes, holds)
Required PPE
- Life jacket / PFD at all times on the barge and its access, of the type set out in SWP-109 Section 5 for your jurisdiction. US: unguarded barge decks, Coast Guard-approved work vest or buoyant vest (1926.605(d)(3)); longshoring aboard vessels where the employee might fall into the water (1918.105(b)). Canada federal: COHSR 12.15(1)(a) or MOHS 147(1).
- Hard hat with chin strap (company rule).
- Safety footwear with toe protection and slip-resistant soles (Canada federal: slip-resistant where there is a risk of slipping, COHSR 12.11(3)).
- Safety glasses.
- Gloves for line and rigging handling.
- High-visibility apparel (over the PFD or built in).
- Fall protection (full body harness and lanyard) at unguarded edges and openings where SWP-004 requires it: US construction 6 ft (1926.501(b)(1)); Canada federal 3 m or lower where the landing surface is more hazardous (COHSR 12.07(1)); Canada federal on vessels, above 2.4 m unguarded or above an open hold (MOHS 144(1)).
- Hearing protection near engines, generators and pile driving.
Key Procedure Steps
Plan
- Get the barge's stability and deck load information (total, per area, position) from the owner, naval architect or qualified person.
- Make a load placement plan: where each load and machine sits, mats or load-spreading under outriggers and tracks, total weight.
- Get the mooring plan (lines, spuds or anchors) from the barge owner or a qualified marine person, allowing for tide range, current, wind and passing wakes.
- Write the barge into the SWP-109 rescue plan: ring buoys, ladders, the rescue boat able to reach every side, and the abandon-barge signal and muster point.
- Crane on the barge.
Access
- Board and leave only by the access provided.
- US construction access (1926.605(b)): vehicle ramps strong, with side boards, maintained and secured; a ramp or safe walkway unless employees can step safely across; Jacob's ladders double rung or flat tread, maintained and secured, hanging without slack or pulled up entirely; where the access lands on or flush with the top of a bulwark, secured steps with at least one handrail about 33 in high down to the deck; nothing laid on or across the gangway; lit for its full length; located so loads do not pass over people.
Mooring and lines
- Tend lines for tide, current and draft change from loading.
Working on deck
- Keep decks and passages clear.
- US: at least one Coast Guard-approved 30 in lifering with at least 90 ft of line and at least one ladder reaching from the top of the apron to the water, in the vicinity of each barge in use (1926.605(d)(2)).
Loading
- Load to the placement plan.
- Read the four corners of draft before and after loading.
- Secure every load: crib, chock and lash.
Crane operations
- Set up the swing / crush zone: barriers, or warning signs plus high-visibility markings with the crew trained on them (US 1926.1437(c)).
- Operator checks the list / trim device, the house lock and (where the competent person says wind matters) the wind indicator (US 1926.1437(e)).
- Lift only within the reduced capacity or on-water chart for the crane's marked location.
- The competent person adjusts or stops operations for wind, ice and snow (US 1926.1417(n)) and stops lifts when wave height, wind or current exceed the lift plan.
- Keep continuous communication between operator, signal person and deck crew.
- Diver in the water: follow SWP-111.
Moving people by crane
- US: hoisting a worker solely for transfer to or from a marine work site only in a personnel platform or a marine-hoisted personnel transfer device; the device carries only workers, not more than it is designed for; each worker wears a Coast Guard PFD approved for industrial use (1926.1431(r)).
Tows, shifting and weather
- Before a tow or shift: secure all loads and equipment, stow the crane boom and lock the house, clear people off the barge unless needed, agree signals with the towboat.
- Severe weather forecast: move the barge to shelter if planned, double up or adjust lines, secure equipment and materials, and take non-essential people off.
Close-out
- At end of shift: secure loads, lock the crane, tend lines for the overnight tide, close hatches, check voids, account for everyone.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Everyone working on the barge: briefed on this SWP, SWP-109 man-overboard steps, the pinch zone, the swing / crush zone and the barge's emergency procedure.
- Crane operator
- Signal person: qualified before giving signals (US 1926.1428(a)); Canada federal per SWP-006.
- Competent person for barge and crane inspections: designated in writing (company rule); US shift and monthly inspections by a competent person (1926.1437(h)(3)).
- Qualified person / surveyor: annual external barge inspection by a qualified person with vessel expertise; four-year internal survey by a marine engineer, marine architect, licensed surveyor or other qualified person (US 1926.1437(h)(4)-(5)).
- Deckhands / line handlers: trained in line handling, snap-back zones, tide adjustment and the barge's mooring plan (company rule).
- Towboat / vessel operator: holds the vessel qualifications their jurisdiction requires (not specified here).
- Rescue boat operator: per SWP-109.
- Refresher: Company rule: annual refresher (every 12 months).
- Drills: Company floor: man-overboard drill before work starts on the barge, when the crew changes, and at least monthly during active barge operations.
Regulatory References
- 29 CFR 1926.605, Marine operations and equipment.
- 29 CFR 1926.106, Working over or near water (see SWP-109).
- 29 CFR 1926 Subpart CC, Cranes and Derricks in Construction: 1926.1401 (definitions), 1926.1412 (inspections), 1926.1417(n) (wind), 1926.1424 (work area control), 1926.1427 and 1926.1428 (operator, signal person), 1926.1431(k)(10), (r) (personnel hoisting over water, marine transfer), 1926.1437 (floating cranes / derricks and land cranes / derricks on barges).
- 29 CFR 1926.501(b)(1), Fall protection (see SWP-004).
- 29 CFR 1918 Longshoring: 1918.25, 1918.26 (access to barges), 1918.97 (first aid, life-rings), 1918.105 (PFDs). 29 CFR 1917.26 (marine terminals).
- 29 CFR 1904.39, Reporting fatalities, hospitalizations, amputations and losses of an eye.
- US Coast Guard rules for the towing vessel and barge (33 CFR, 46 CFR). Named only; the vessel operator is responsible for them.
- Canada Occupational Health and Safety Regulations (COHSR) SOR/86-304: s. 1.4 (application), Part XII (12.07 fall protection, 12.11 footwear, 12.15 drowning, 12.2 training), Part XIV (materials handling and cranes, see SWP-006), Part XV (hazardous occurrence reporting).
- Maritime Occupational Health and Safety Regulations (MOHS) SOR/2010-120: s. 3 (application), s. 12 (means of access), ss. 93, 94 (emergency procedures and training), s. 144 (fall protection), s. 147 (drowning), s. 277 (reporting); Part 9 (persons transfer apparatus, named only).
- Provincially regulated work: follow your province's OHS regulation.
Download the Full PDF Template
Get the complete Barge Operations document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial