Diving Operations Support

Surface support safety for commercial diving operations including air supply and rescue procedures.

Revision 2.1 Updated Apr 19, 2026

Scope and Purpose

This procedure covers the site crew who work around a contracted commercial dive team on a construction, marine or industrial site: supervisors, crane and equipment operators, vessel and barge crew, pump and electrical crews, riggers and labourers.

It covers: planning the dive with the dive contractor, isolating equipment that could hurt a diver, controlling vessel traffic and overhead lifts, keeping the dive area clear, communication between the site and the dive supervisor, and the site's part of a diving emergency.

Hazard Identification

  • Diver pulled into or pinned at an intake, pipe, culvert, gate or outfall (differential pressure)
  • Moving machinery, propellers, thrusters, pile hammers, dredges near the diver
  • Loads, materials or tools dropped or swung over the diver
  • Barge, crane barge or support vessel moving, swinging on anchors, or anchors being worked
  • Passing vessel traffic, prop wash and wake
  • Electrical: hand-held tools and leads in the water, welding/cutting circuits, shore power
  • Blasting / explosives on site
  • Contaminated air to the diver (engine exhaust near the dive compressor intake)
  • Contaminated water (sewer outfall, spill, industrial discharge)
  • Fall into water from barge, dock or dive platform
  • Struck by crane, excavator or vehicle at the waterfront
  • Cold, wind, heat, sun at the dive location
  • Decompression illness or injury after the dive

Required PPE

  • Life jacket or PFD whenever working over or near water where there is a danger of drowning. US: Coast Guard-approved life jacket or buoyant work vest, inspected before and after each use (29 CFR 1926.106(a)-(b)). Canada federal: life jacket or PFD meeting COHSR 12.15(1)(a).
  • Hard hat where there is overhead lifting or falling-object risk.
  • Safety footwear with slip-resistant soles for wet decks.
  • Safety glasses.
  • Gloves for line and material handling.
  • High-visibility apparel where vehicles or equipment move.
  • Cold- or wet-weather gear as conditions require.

Key Procedure Steps

Planning (days before)

  1. Get the dive contractor's dive plan, emergency plan and team list.
  2. Walk the site with the dive supervisor.
  3. Build the isolation list together: item, energy type, how it is isolated, who isolates, how it is verified.
  4. Schedule site work around the dive.
  5. Notify the harbour master, port authority or nearby vessel operators if the dive plan or the waterway requires it.

Set-up (day of the dive)

  1. Hold the pre-dive briefing with site crew and the dive team.
  2. Display the dive markings for your jurisdiction:
  3. Isolation lead isolates, locks, tags and verifies each item on the list.
  4. Move running engines and vehicles away from the dive compressor intake.
  5. Post the lookout.
  6. Complete the Pre-Work Checklist.

While a diver is in the water

  1. Do not start, move, open, pump, swing, lift or relocate anything inside the dive area without the dive supervisor's OK for that action.
  2. No loads over the diver.
  3. Do not lower hand-held electrical tools into the water, or pull them out, while energized.
  4. Keep off the dive station unless the dive supervisor calls you.
  5. Lookout warns approaching vessels and tells the dive supervisor at once.
  6. Report to the dive supervisor immediately: any boat approaching, equipment moving, change in current or tide, weather change, a spill or discharge, loss of radio contact with the site.
  7. If the dive supervisor calls an emergency, follow Section 9.

Close-out

  1. Wait for the dive supervisor to confirm in person or by radio that every diver is out of the water and the dive is finished for that item or area.
  2. Only then remove locks and restore equipment, in the order agreed on the isolation list.
  3. Take down flags and lights when diving ends for the day.
  4. Debrief: near misses, conflicts, changes needed for the next dive.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • Dive contractor: provides proof that its dive team is trained and assigned to tasks per its experience (US 1910.410; Canada COHSR 18.5, 18.6, 18.7) and names the dive supervisor.
  • Site supervisor: trained in this SWP and the dive contractor's emergency plan.
  • Isolation lead: trained and authorized in the site's lockout / hazardous energy program.
  • Crane operators, signal persons, riggers: qualified for the lift per the Crane Rigging SWP (SWP-006) and your jurisdiction.
  • Vessel operators: qualified for the vessel.
  • Site workers assigned any dive support task: (line handling, oxygen, stage or basket lifts): they are dive team members for that task, so they must be trained for it before doing it (US 1910.410(a)-(b)).
  • All site crew at the dive location: briefed on this SWP, the dive area limits, stop signals and the emergency plan.
  • Refresher: Company rule: annual refresher (every 12 months).

Regulatory References

  • 29 CFR 1910 Subpart T, Commercial Diving Operations: 1910.401, .402, .410, .420, .421, .422, .423, .424 to .426, .430, .440.
  • 29 CFR 1926 Subpart Y, Diving (1926.1071 to 1926.1092): construction diving text is identical to 1910 Subpart T.
  • 29 CFR 1926.106, Working over or near water.
  • 33 CFR 83.27, Inland Navigation Rules, Rule 27 (vessels engaged in diving operations).
  • 46 CFR Part 197 Subpart B, applies only to diving from Coast Guard inspected vessels, deepwater ports and Outer Continental Shelf work (46 CFR 197.202).
  • Canada Occupational Health and Safety Regulations (SOR/86-304), Part XVIII Diving Operations; Part XII s. 12.15 Protection Against Drowning.
  • CSA Z275.2, Occupational Safety Code for Diving Operations (referenced by COHSR 18.7 and 18.24).
  • Collision Regulations (Canada) for vessel lights and shapes.
  • Provincially regulated work: follow your province's OHS diving rules and CSA Z275.2.

Download the Full PDF Template

Get the complete Diving Operations Support document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial