Concrete Pouring Procedure
This procedure covers safe concrete placement including pump truck operations, manual placement and finishing.
What This Procedure Covers
- Plan the pour
For the placement and finishing crew. Pump operation, crane lifts, formwork design and specialist servicing require their own approved procedures and competent personnel. Brief all crews before delivery starts.
Define the stop signal and restart authority: Agree the communication method between delivery, pump or lifting operators and the placement crew. Anyone identifying danger must be able to call a stop. If communication is lost, stop placement until it is restored and the responsible person authorizes restart.
- Release the work area before placing
Confirm current formwork and support drawings are available and required inspections are complete. Record who authorizes the pour and how supports will be observed safely during and after placement.
Keep loads within the approved design: Respect the specified pour sequence and rate. Do not stockpile concrete, equipment or materials in a way that exceeds the design. Keep escape paths available and people clear of areas exposed to a failure. Stop for movement, unexpected deflection or distress; obtain competent assessment before restarting. Use designated access and work platforms. Protect slab edges, openings and protruding steel before placement begins. Keep delivery vehicles separate from workers, and confirm overhead and ground hazards are addressed in the equipment setup plan.
- Prevent cement contact and exposure
Wet concrete can cause serious burns and dermatitis. Arrange washing facilities and eye flushing before the pour. Brief workers on the product SDS, exposure response and where to obtain first aid.
Keep wet concrete out of clothing and boots: Plan the task to minimize contact. Where contact cannot be avoided, use suitable waterproof protection, including protection for kneeling work. Wear trousers over boots and keep concrete out of gloves and footwear. Replace damaged or contaminated protection before resuming. Wash exposed skin promptly and remove contaminated clothing. Follow the SDS and first-aid arrangements for exposure; do not wait for pain to develop. Cutting or grinding hardened concrete requires a separate silica-control assessment and suitable controls, not simply a generic dust mask.
- Place and consolidate under control
Use the agreed delivery and placement sequence. Position workers on secure footing with clear access. Keep people out from beneath suspended buckets or loads and clear of vehicle and equipment movements.
Respect hose-whip and pressure hazards: The pump operator must coordinate starting and restarting. Keep the crew clear of the discharge and hose movement area until the operator confirms it is safe to approach. Stop for abnormal flow, a blockage or loss of communication. Placement workers must not open pressurized delivery lines or attempt an improvised blockage clearance. Use vibrators and finishing tools according to their instructions and the specification. Maintain guards and safe cable routes. Keep hands clear of moving parts, and refer faults to authorized personnel. Never alter bracing or shores to gain access during the pour.
- Finish, cure and contain washout
Use the specified curing method and protect the pour from unauthorized access and adverse weather. Review curing-product SDS, application equipment and ventilation before use.
Release supports only through the approved process: Form and shore removal requires confirmation that the structure can support the relevant loads under the approved plans or appropriate strength evidence. Do not use elapsed time alone as permission to strip. Maintain required reshoring and record the responsible person's release. Collect washwater and solids in the designated leakproof containment. Keep them out of drains, soil and watercourses. Check containment before use and arrange lawful recovery or disposal. Clean equipment only under the applicable safe cleaning procedure.
- Record the pour and hand over
Record the completed area, restrictions, deviations and outstanding actions. Make the acceptance and curing records available to the receiving supervisor before the next trade enters.
Reference guidance: OSHA 1926.703; HSE Cement; ACPA hose-whip safety guidance; EPA Concrete Washout. Complete with local requirements, the pour design and equipment instructions.
Download the Full PDF Template
Get the complete Concrete Pouring Procedure document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial