Core drill operation including GPR scanning, slurry management and structural considerations.

Rev 02 Updated Apr 19, 2026

What This Procedure Covers

  1. Scope and hole authorization

    For stand-mounted diamond core drilling in an approved location. Handheld coring, hydraulic power systems and structural cutting beyond the approved penetration need their own equipment-specific arrangements.

    Obtain authorization before cutting: Confirm structural and service restrictions using the required survey, drawings and competent assessment. A scan alone is not authorization to cut reinforcement or post-tensioning. Stop where the path or consequences of the penetration remain uncertain.

  2. Survey, exclusion and core capture

    Assess both sides of the intended hole. Protect people from the bit, expelled water, debris and the core as it separates. Maintain exclusion until the opening is controlled.

    Plan for the actual core mass: Estimate the core weight from its dimensions and material and provide a suitable support or capture arrangement for the drilling direction. A generic instruction to place a catcher below the hole does not address every wall, floor or overhead setup. Keep hands and people out of the release path.

  3. Secure the stand for the drilling direction

    Inspect the drill, carriage, column, locks and base. Use the mounting method permitted for the actual stand, surface, bit size and direction; record its installation and verification requirements.

    Vacuum mounting is conditional: Verify surface suitability, seals, pump operation and the specified vacuum indication before and during use. Provide the additional restraint required for horizontal work. Do not rely on vacuum alone for overhead work; some models prohibit that mounting method entirely. Follow the actual manual. Keep the carriage controlled when fitting the motor or bit. Do not change the mounting arrangement or release the base while the machine or core is unsupported. Stop immediately if mounting security or vacuum is lost.

  4. Water, electrical protection and silica

    Use the water-delivery and collection systems specified for the drill and orientation. Keep water out of the motor and electrical connections and maintain the required protective-device checks.

    Overhead work needs its prescribed collection setup: Use only permitted drilling orientations and the required water collector and wet extractor. Some models prohibit angled upward drilling because collection cannot function correctly. Confirm these limits before setup, not after water begins running over the machine. For the applicable US construction Table 1 rig-mounted core-drill method, integrated water must reach the cutting surface and the equipment must be maintained to minimize dust. Any different or dry method needs its own approved exposure-control assessment; a P100 entry alone is not that plan.

  5. Drill and complete the penetration

    Select the speed and feed for the bit diameter, material and drill instructions. Do not assume speed should be increased while cutting; transmission designs and permitted adjustments differ.

    Monitor the system, not slurry colour alone: Check water delivery, collection, mounting security and motor load throughout the cut. Slurry colour is not proof of safe operation. Stop for binding, lost flow, leaks, unexpected reinforcement or movement. Disconnect the energy source before clearing a jam by the approved method. Follow the model shutdown and retraction sequence. Ensure rotation has stopped and the machine and core are supported before releasing fastenings. Protect the new opening and arrange the specified sleeve or firestop through the responsible trade.

  6. Cleanup and site records

    Contain slurry and collect it before it dries into airborne dust. Dispose of slurry and cores by the approved site method; do not discharge into drains without authorization.

Reference guidance: OSHA Rig-Mounted Core Saws or Drills (3929); Hilti DD 200/DD 250-CA and DD 120 operating guidance on fastening and water collection. Verify the current instructions supplied with the actual drill and stand before approval.

Download the Full PDF Template

Get the complete Core Drill Operation document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial