0
Environmental & Hazmat

Heat Stress Prevention

Heat-related illness prevention with WBGT monitoring, acclimatization and emergency response.

Revision 2.2 Updated Nov 6, 2026

Scope and Purpose

This procedure covers preventing, recognizing and responding to heat-related illness for work outdoors in hot weather and indoors in hot spaces or near hot processes: planning, measuring heat, water, rest and shade, acclimatization, watching workers and emergency response.

Covers: every crew, supervisor and visitor working at or above the initial heat trigger (Section 2), including work in impermeable suits, respirators, containments, equipment cabs and confined spaces.

Hazard Identification

  • Heat stroke
  • Heat exhaustion, fainting, cramps, heat rash
  • Dehydration
  • Unacclimatized workers
  • Vapor-impermeable suits, respirators, containments
  • Radiant heat (sun, hot asphalt, roofing, hot work, engines, furnaces)
  • Hot equipment cabs and operator positions
  • Hot indoor spaces
  • Sunburn and UV
  • Lone worker becomes ill unseen
  • Poor judgment and slower reactions leading to incidents

Required PPE

  • Light-coloured, loose, breathable clothing where the task allows (company rule). Required FR clothing, chemical suits and respirators stay on; the work and rest plan accounts for them.
  • Hard hat: US ANSI Z89.1 (1926.100); Canada federal CSA Z94.1 or ANSI Z89.1 (COHSR 12.1). Brims, neck shades and cooling liners only if approved by the hard hat maker (company rule; protection equipment must not in itself create a hazard, COHSR 12.04).
  • Safety glasses with UV protection or tint for outdoor work (company rule). US: ANSI Z87.1 (1926.102). Canada federal: CSA Z94.3 (COHSR 12.12).
  • Sunscreen available on site (company rule). Canada federal: if the employer provides sunscreen, it must be broad-spectrum with SPF 30 or higher (COHSR 12.14(2)). Company rule: the same everywhere.
  • Cooling PPE (cooling vests, cooling towels) where suitable. If it is provided, its cooling must be kept working during use: swap ice packs, re-wet towels (company rule from the proposed rule).

Key Procedure Steps

Before the hot season

  1. Write or update the site heat plan: work covered, heat measure used, heat safety coordinator, water, shade, rest, acclimatization, observation, emergency plan.
  2. Train workers and supervisors (Section 6).
  3. Get water containers, shade structures, fans, cooling supplies and a heat index or WBGT meter.

Each shift

  1. Check the forecast.
  2. Decide the level: below the initial trigger, normal work; at or above the initial trigger, steps 6 to 11; at or above the high trigger, steps 6 to 15.
  3. Brief the crew: level, water and shade locations, breaks, buddy pairs, who is on the acclimatization schedule, how to get help.

At or above the initial heat trigger

  1. Measure heat index or WBGT on site at least every hour (company floor) and record it.
  2. Keep cool drinking water close to every work area: at least 1 quart (about 1 L) per worker per hour available (company floor from the proposed rule).
  3. Keep a break area with shade or air conditioning, big enough for everyone on break, within about 2 minutes' walk (company floor).
  4. Acclimatization (company floor): new workers are limited to 20 % of a normal shift's heat exposure on day 1, 40 % on day 2, 60 % on day 3 and 80 % on day 4.
  5. Keep two-way communication with every worker (voice, radio or phone).

At or above the high heat trigger

  1. Give every worker a rest break of at least 15 minutes, in the break area, at least every 2 hours (company floor from the proposed rule).
  2. Watch workers: buddy system for everyone, or a supervisor or heat safety coordinator watching no more than 20 workers (company floor from the proposed rule).
  3. Contact lone workers at least every 2 hours (company floor).
  4. Before the shift or when the high trigger is reached, remind workers: drink plenty of water; take the breaks; how to get help and what to do in a heat emergency; where the water and break area are.

Suits, respirators and hot spaces

  1. Before work in impermeable suits or respirators in heat, the supervisor sets shorter work periods and longer rest periods out of the suit in a cool area (company rule).
  2. Hot indoor areas: use fans or natural ventilation, dehumidification or air conditioning; shield radiant sources.

End of shift

  1. Account for every worker.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • All workers: Before work at or above the initial trigger: heat hazards; heat-related illnesses and their signs, and which signs need emergency action; risk factors (heavy work, clothing and PPE, lack of acclimatization, age, health, alcohol, some medications); water, rest and shade and where they are; taking off heat-trapping PPE at breaks; acclimatization; buddy system; reporting signs in yourself and others; the site heat plan and who the heat safety coordinator is.
  • Supervisors and heat safety coordinators: All of the above, plus measuring heat index or WBGT, the company triggers, the acclimatization schedule, rest breaks, observation, emergency steps and records.
  • First aiders: US: valid first aid certificate where no clinic or hospital is reasonably accessible (1926.50(c)).
  • Respirator users: Respiratory protection training (1910.134(k)).

Regulatory References

  • Occupational Safety and Health Act of 1970, section 5(a)(1) (29 U.S.C. 654(a)(1)), General Duty Clause.
  • 29 CFR 1926.21(b)(2) (training); 1926.50 (first aid); 1926.51(a) (potable water); 1926.95, 1926.100, 1926.102 (PPE); 1910.141(b)(1) (potable water, general industry); 1910.134(e)(7), (k) (respirator medical re-evaluation, training).
  • 29 CFR 1904.39 (reporting).
  • OSHA proposed rule, Heat Injury and Illness Prevention in Outdoor and Indoor Work Settings, 89 FR 70698 (August 30, 2024), Docket OSHA-2021-0009 (proposed 1910.148 and 1926.67). Not in force. Source of some company floors.
  • NIOSH Publication 2016-106, Criteria for a Recommended Standard: Occupational Exposure to Heat and Hot Environments (RAL and REL). Named.
  • ACGIH, TLVs and BEIs: Heat Stress and Strain. Named.
  • Canada Labour Code Part II, s. 124.
  • COHSR SOR/86-304: Part IX (9.24 to 9.27, potable water), Part XII (12.04, 12.1, 12.12, 12.14(2)), Part XIV (14.9, weather and heat protection on materials handling equipment), Part XV (reporting), Part XVI (first aid), Part XIX (hazard prevention program, training).
  • SOR/2026-10: COHSR 10.1 ("thermal stress") and 10.19.3 (thermal stress procedures), in force January 30, 2027; Maritime Occupational Health and Safety Regulations s. 255.3, same date.
  • Provincially regulated work: follow your province's OHS regulation.

Download the Full PDF Template

Get the complete Heat Stress Prevention document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial