Mold Remediation
Mold remediation procedures including containment, removal and post-remediation verification.
Scope and Purpose
This procedure covers the removal and clean-up of mold growth on building materials and contents after water damage, flooding, leaks or condensation: assessment, the remediation plan, containment, removal, cleaning, drying, waste and checking that the job is finished.
Two rules come first:
Hazard Identification
- Breathing mold spores and fragments (allergic reactions, asthma attacks, irritation; some molds produce toxins)
- Spreading mold to clean areas
- Hidden mold released when opening walls or stripping wallpaper
- Skin and eye contact with mold and cleaners
- Asbestos or lead in materials to be removed
- Cleaners and biocides (toxic; bleach mixed with ammonia gives off toxic gas)
- Electric shock in wet areas
- Structural weakness from long-term water damage
- Heat stress in suits and containment
- Falls from ladders and work at height
- Confined spaces (crawlspaces, tanks, vaults)
- Lifting wet, heavy materials
Required PPE
- Biocides or strong cleaners in use: add cartridges and gloves chosen from the SDS. HEPA filters do not remove vapours or gases.
- Every respirator the company requires, the N95 included, is used under the respiratory protection program: written program (1910.134(c)(1)); medical evaluation before fit testing or use ((e)(1)); fit test before first use, on any change of facepiece and at least annually ((f)(2)); user seal check each time it is put on ((g)(1)(iii)); no facial hair or anything else between the seal and the face ((g)(1)(i)); training ((k)). Canada federal: NIOSH-listed or CSA-listed respirators meeting CSA Z94.4, used and cared for per CSA Z94.4 (COHSR 12.13(2), (4)).
- Gloves: long gloves to mid-forearm. With biocides or strong cleaners: natural rubber, neoprene, nitrile, polyurethane or PVC.
- Eye protection: goggles designed to keep out dust and small particles; glasses or goggles with open vents are not acceptable. A full-facepiece respirator covers the eyes. Canada federal: CSA Z94.3 (COHSR 12.12).
- Skin protection: Canada federal COHSR 12.14.
- Hard hat and safety boots where there is demolition or overhead work.
Key Procedure Steps
Assessment and planning
- Find the water or moisture source and plan its repair.
- Measure the total surface area affected and set the size category.
- Confirm the asbestos and lead status of every material to be disturbed.
- Canada federal: where health is likely to be endangered, the qualified person investigates; their written report and the employer's written control procedure are in place before work (COHSR 10.4, 10.5).
- Sampling is not needed in most cases where mold is visible.
- Write the remediation plan.
Containment set-up
- Shut off the HVAC serving the area and lock it out (SWP-001), or seal every opening inside the containment.
- De-energize wet circuits and lock out.
- Small jobs: no containment required by EPA. Company rule: isolate the area with poly where practical and keep occupants out.
- Medium jobs: limited containment: single layer of 6-mil fire-retardant poly; slit entry with an outside flap; vents, doors, chases and risers sealed; negative pressure with a HEPA-filtered fan unit exhausted outdoors.
- Large jobs: full containment: two layers of poly; decontamination chamber or airlock big enough for a waste container and for putting on and taking off PPE; slit entries with outside flaps; negative pressure; continuous pressure gauge (company rule).
- Before removal starts, smoke test seams and penetrations (company rule) and confirm the poly billows inward on all surfaces.
Removal and cleaning
- Mist moldy material lightly before removal to keep spores down (company rule).
- Remove moldy porous materials.
- Clean semi-porous and non-porous surfaces: damp wipe or scrub with water, or water and detergent; dry quickly.
- Biocides are not used as a routine step.
- Do not paint or caulk moldy surfaces.
- Wet vacuums only on materials that are still wet.
- Change HEPA vacuum filters in PPE; bag the filter and contents in sealed bags.
Drying
- Dry materials to the dry standard (company floor).
Leaving the work area
- Full containment: put contaminated PPE, except respirators, in a sealed bag in the decontamination chamber.
- Waste leaves the containment only in sealed bags.
Finishing
- HEPA vacuum and damp wipe all surfaces inside the containment, including the poly, in full PPE.
- Verification before the containment comes down: moisture source fixed; no visible mold, mold-damaged material or moldy odour; materials at the dry standard.
- Take down the containment (poly folded inward and bagged).
- Revisit the site shortly after the work: no signs of water damage or mold growth.
- Keep the plan, verification results, any sampling results and waste records in the project file.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Remediation workers: This SWP and the job's plan; mold health effects; containment and negative pressure; PPE and decontamination; waste handling; hazard communication for every cleaner and biocide used (1910.1200(h)(1)).
- Respirator users: Respirator training before use (1910.134(k)(1), (k)(3)); medical evaluation; fit test.
- Remediation manager / supervisor: All of the above, plus planning, size categories, containment checks, verification.
- Mold assessor / qualified person: Experience in mold sampling protocols, sampling methods and interpreting results.
Regulatory References
- Occupational Safety and Health Act of 1970, section 5(a)(1) (29 U.S.C. 654(a)(1)).
- 29 CFR 1926.21(b)(2), (b)(3) (training); 1926.28(a) and 1926.95 (PPE); 1926.102 (eye protection); 1926.103 and 1910.134 (respiratory protection); 1926.59 and 1910.1200 (hazard communication); 1926.50 (first aid, quick-drench); 1926.1101(k)(2)(i) (owner determination of asbestos before work).
- 29 CFR 1904.39 (reporting).
- US EPA, Mold Remediation in Schools and Commercial Buildings (EPA 402-K-01-001), including Table 1 (water damage) and Table 2 (remediation guidelines). Guidance.
- IICRC S520 and S500; OSHA mold Safety and Health Information Bulletin. Named.
- Canada Labour Code Part II, s. 122(1) ("hazardous substance"), s. 124, s. 125.1.
- COHSR SOR/86-304: Part X (10.4, 10.5, 10.6, 10.14; asbestos 10.26.1 onward via SWP-076), Part XII (12.12, 12.13, 12.14, 12.2), Part XV (reporting), Part XIX (hazard prevention program, training).
- CSA Z94.4 (respirators) and CSA Z94.3 (eye protection), named by COHSR.
- Provincially regulated work: follow your province's OHS regulation.
Download the Full PDF Template
Get the complete Mold Remediation document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial