Shoring and Bracing Systems
Hydraulic, steel and timber shoring system installation and inspection for excavation support.
Scope and Purpose
This procedure covers selecting, installing, inspecting, using and removing support systems that hold up the walls of an excavation so they cannot cave in.
Covers:
Hazard Identification
- Cave-in before shoring is in
- Shoring not strong enough (wrong soil type, depth, width, spacing or member size)
- Surcharge loads (spoil, materials, equipment, nearby structures)
- Adjacent building, wall, footing, sidewalk or utility undermined
- Kickout or sliding of braces
- Failure during removal
- Soil loss below or behind the shoring
- Water in or behind the trench
- Hydraulic failure (leak, loss of pressure, hose burst)
- Struck by members being lowered or removed
- Falls into the trench from the edge
- Hazardous atmosphere
- Damaged or rotten members
- Pinch and crush (pins, jacks, timbers)
Required PPE
- Hard hat.
- Safety footwear.
- Safety glasses; face shield or goggles when pumping hydraulic fluid or driving wedges.
- High-visibility vest or garment. Required in the US when exposed to public vehicle traffic; company floor: worn by everyone on site while equipment is working. Company floor: ANSI/ISEA 107 Class 2 or CSA Z96 Class 2 or higher.
- Work gloves (timber, steel and hydraulic components).
- Hearing protection where equipment noise requires it.
- Fall protection at open edges per Fall Protection SWP-004 where barricades are not in place.
Key Procedure Steps
8.1 Plan and select
- The competent person classifies the soil (SWP-005) and measures depth and width.
- Choose the design source, in this order of preference: the manufacturer's tabulated data for the system on site; US Appendix C (timber) or D (aluminum hydraulic) for trenches 20 ft or less; other PE-approved tabulated data; a PE design.
- Read the limits in the data.
- Adjacent structures: do not dig below the level of a footing or foundation of a nearby building or wall where it could pose a hazard unless underpinning or other support is provided, the excavation is in stable rock, or a PE has approved that the structure is unaffected or that the work will not pose a hazard.
- Pick member sizes and spacing from the data for the soil, depth, width and chosen brace spacing.
- Inspect every member before it goes in (checklist item 6).
8.2 Install (from the top down, as the trench is dug)
- Dig only as far ahead as the crew can shore.
- Nobody enters an unsupported section.
- Set the top brace first, close to the top.
- Hydraulic systems: place rails against the walls, set cylinders at the spacing in the data, and pressurize to the manufacturer's instructions.
- Timber systems: set uprights (or sheeting), then wales with the larger dimension horizontal, then cross braces at the spacing in the table.
- Set the bottom: Appendix C timber, where the lowest brace is more than 2.5 ft above the bottom, embed the uprights (lowest brace no more than 36 in above the bottom) or use a mudsill (no more than 42 in).
- Use close sheeting where soil ravels, and tight sheeting where soil is saturated or submerged or water must be held back.
- Plumb and line up all members.
- Install the ladder in the shored section.
- The competent person checks the installed system against the data, inspects the trench and edge, and authorizes entry.
8.3 Work in the shored trench
- Work only inside the shored length.
- Do not stand on, climb on, sit on or hang anything from braces, cylinders or wales (company rule).
- Do not dig more than 2 ft (0.61 m) below the bottom of the members, and only if the system is designed for the full trench depth and there is no sign of soil loss from behind or below.
- Keep spoil and materials at least 1 m (3.3 ft) back (company floor).
- Never strike or move a member with the bucket.
- Keep water out (dewatering, diversion).
8.4 Remove (from the bottom up)
- Everyone out of the trench except the removal crew working from the top or from inside the remaining supported section.
- Start at the bottom.
- Backfill as each level is removed.
- Hydraulic systems: release pressure from the top with the installation tool, then lift cylinders and rails out.
- Timber: knock out wedges from above where possible; lift members out on ropes.
- Backfill and compact the remaining trench, or protect it as an open excavation under SWP-005.
- Clean and inspect all members.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Competent person: Soil classification; reading the tabulated data or PE design used on this job (member sizes, spacing, depth limits, conditions where the data does not apply); inspection of the system; authority to stop work.
- Qualified person (Canada federal): Knowledge, training and experience to install and remove shoring and bracing, or to supervise it.
- Shoring installers: The manufacturer's installation, pressurizing and removal instructions for this system; Appendix C / D layout where used; working only from above or inside the supported section.
- Equipment operator: The machine; digging ahead only as far as the crew can shore; setbacks; not contacting the shoring.
- Trench workers: This SWP and SWP-005: stay in the shored length, no standing on braces, ladder use, signs of failure.
Regulatory References
- US OSHA 29 CFR 1926.650 (definitions).
- US OSHA 29 CFR 1926.651(c)(2) (egress), (h) (water), (i) (adjacent structures), (j) (spoil setback), (k) (inspections).
- US OSHA 29 CFR 1926.652(a) (protection required), (c) (design of support systems), (d) (materials and equipment), (e) (installation and removal of support).
- US OSHA 29 CFR 1926 Subpart P Appendix A (soil classification), Appendix C (timber shoring for trenches), Appendix D (aluminum hydraulic shoring for trenches), Appendix F (selection of protective systems).
- US OSHA 29 CFR 1926.1053(b)(1) (ladders), 1926.21(b)(2) (training), 1904.39 (reporting).
- Canada: COHSR SOR/86-304 Part III s. 3.12 (Excavation, incl. (3) shoring and bracing, (5) qualified person, (6) 1 m setback), s. 3.11(4) (ladders), Part XV (reporting), for federally regulated workplaces.
- Provincial OHS regulations each have excavation and shoring requirements. Use the one for your province.
- Manufacturer's tabulated data, instructions and written approvals for the system in use; PE designs for this site.
Download the Full PDF Template
Get the complete Shoring and Bracing Systems document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial