Scope and Purpose

This procedure sets out how to erect structural steel safely: planning, hoisting and rigging, connecting, keeping the structure stable, decking, and protecting ironworkers and everyone below from falls and falling objects.

Covers: setting columns, beams, girders, trusses, steel joists and joist girders, bridging, metal decking, systems-engineered metal buildings, and the bolting, welding, burning, plumbing and guying done as part of erection. Moving point to point while doing this work is included.

Hazard Identification

  • Falls from the structure, deck edges, openings and while moving point to point
  • Falling through holes and openings in deck
  • Structural collapse of partly erected steel
  • Struck by or crushed under suspended loads
  • Multiple lift (christmas-tree) failures
  • Crane failure, overturn or contact with power lines
  • Falling tools, bolts and materials
  • Tripping on shear studs, rebar and bridging
  • Wind on deck sheets, bundles and broad members
  • Overloading joists and deck with bundles
  • Welding and cutting (burns, fire, fume, arc flash to eyes)
  • Weather: ice, rain, snow, heat, cold
  • Hanging in a harness after a fall

Required PPE

  • Hard hat. Chin strap worn when working aloft (site rule).
  • Full-body harness (body belts are not allowed for fall arrest).
  • Shock-absorbing lanyard or self-retracting lifeline. Twin-leg (100% tie-off) lanyard for moving between anchorages (site rule).
  • Locking snaphooks and carabiners only.
  • Safety glasses.
  • Safety footwear with a defined heel and slip-resistant sole (site rule).
  • Work gloves suited to the task.
  • High-visibility vest or garment on the ground and around cranes and traffic.
  • For welding and cutting: welding helmet or burning goggles with the right shade, FR clothing, leather gloves and sleeves.
  • Hearing protection where noise requires it.

Key Procedure Steps

Set-up

  1. Confirm items 1 to 3 of the checklist.
  2. Hold the pre-erection meeting: sequence, connection details, bolt counts, bracing and guying, fall protection and anchorages, CDZ (if any), load routes, rescue plan.
  3. Set up and inspect the crane on the planned pad.
  4. Mark and barricade the area below the erection.

Hoisting and rigging

  1. Rig each load so it cannot shift.
  2. Use tag lines.
  3. Multiple lifts: only with a manufactured multiple lift assembly; max 5 members; beams and similar members only; each member at its center of gravity and reasonably level; rig top down with members at least 7 ft (2.1 m) apart; set bottom up; total within the crane load chart and the rigging chart; controlled load lowering whenever the load is over the connectors.
  4. Operator stops and refuses any load when safety is in doubt.

Columns and connecting

  1. Set columns on level finished floors, pre-grouted leveling plates, leveling nuts or shim packs.
  2. Connectors wait until the member is close and under control before guiding it in.
  3. Before releasing the hoist line from a solid web member: at least two bolts per connection, of the size and strength on the erection drawings, drawn up wrench-tight (or the equivalent set by the engineer of record).
  4. Double connections: keep at least one bolt with its wrench-tight nut on the first member, unless a seat or equivalent device is bolted or welded in place first.
  5. Fall protection while connecting:
  6. Never use a steel joist, joist girder, purlin or girt as a fall arrest anchorage unless a qualified person has approved it in writing.

Structural stability (multi-story)

  1. Install permanent floors as erection progresses.
  2. Keep a fully decked or planked floor or nets within two stories or 30 ft (9.1 m), whichever is less, directly under any erection work.
  3. Perimeter columns extend at least 48 in (1.2 m) above the finished floor, with holes or devices for perimeter cables, unless constructibility does not allow.
  4. Install perimeter safety cables at the final interior and exterior perimeters of each floor as soon as its deck is installed.

Steel joists

  1. Do not place a joist on any support that is not stabilized.
  2. Attach each joist at least at one end on both sides of the seat immediately on placement, before placing the next.
  3. No construction loads on joists until all bridging is installed and anchored and all bearing ends are attached, except as 1926.757(e) allows.

Metal decking

  1. Hoist deck bundles only by packaging designed for hoisting; secure loose items on top.
  2. Lay deck tight and secure each sheet right after placement (except in a CDZ, item 24).
  3. CDZ (US only, only where the plan sets one): between 15 and 30 ft; marked with control lines; max 90 ft (27.4 m) wide and 90 ft deep from the leading edge; only trained deckers doing leading edge work inside; no more than 3,000 sq ft (914.4 m2) of unsecured deck; at least two safety deck attachments per panel, working from the leading edge back to the control line; no final deck attachment or shear connectors inside the CDZ.
  4. Deck over roof and floor holes.
  5. Install shear studs only after deck is in, standing on the deck.
  6. At the end of the shift, or when wind or conditions require, secure deck against movement.

Close-out (each shift)

  1. Secure all tools, bolts and materials aloft or bring them down.
  2. Land and secure loads; boom down or secure the crane per the manufacturer.
  3. Check that bracing, guying, covers, perimeter cables and barricades are in place for the night.
  4. Fall protection left for other trades only if the controlling contractor directs it and has inspected and accepted it.
  5. Record problems found and pass them to the next shift.

Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.

Training Requirements

  • Every worker exposed to a fall: Training by a qualified person in: recognizing fall hazards; using guardrails, perimeter cables, harness systems, positioning and restraint systems, and nets; erecting, maintaining, taking down and inspecting the systems used; preventing falls through holes and openings; and the fall protection rules for steel erection.
  • Connector: All of the above, plus connector training: hazards of connecting, establishing and accessing the connection, connecting techniques, double connections, and connector fall protection.
  • CDZ decker (US, only where a CDZ is used): All of the above, plus CDZ training: hazards in the CDZ, setting it up, access, deck installation and securing methods.
  • Multiple lift rigger and crew: All of the above, plus multiple lift training: the hazards and the procedures and equipment for multiple lifts.
  • Qualified rigger: Qualified person status in rigging.
  • Crane operator: US: trained, certified/licensed and evaluated under 1926.1427.
  • Signal person: US: qualified before giving any signals (1926.1428).
  • Competent person: Knowledge to identify steel erection hazards and authority to correct them; named by the employer.

Regulatory References

  • US OSHA 29 CFR 1926 Subpart R, ss. 1926.750 to 1926.761, Steel Erection.
  • US OSHA 29 CFR 1926 Subpart CC, Cranes and Derricks in Construction, incl. 1926.1408 and 1926.1409 (power lines), 1926.1427 (operator certification), 1926.1428 (signal person), 1926.1431 (hoisting personnel).
  • US OSHA 29 CFR 1926.502 (fall protection system criteria) and 1926.503 (training).
  • US OSHA 29 CFR 1904.39, Reporting fatalities, hospitalizations, amputations and losses of an eye.
  • Canada: Canada Occupational Health and Safety Regulations (COHSR) SOR/86-304, Part XII (fall protection, ss. 12.06 to 12.09; training s. 12.2), Part XIV (materials handling and cranes) and Part XV (hazardous occurrence reporting), for federally regulated workplaces.
  • CSA Z259 series (fall protection equipment), as named in COHSR 12.09.
  • Provincial OHS regulations each have fall protection and crane rules. Use the one for your province.

Download the Full PDF Template

Get the complete Steel Erection and Iron Work document as a fillable PDF, part of the Safe Work Procedures Template Pack.

Get Template Pack

Get This SWP + 4 More Free

Choose from 112 procedures. No credit card, no commitment.

Pick Your 5 Free SWPs

Want Digital Sign-Off for Your SWPs?

Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.

Start Your Free Trial