Scope and Purpose
This procedure covers rigging, inspecting, using and taking down temporary suspended access equipment, and getting workers off it in an emergency.
Covers:
Hazard Identification
- Fall from the platform or chair
- Platform or rigging failure (rope break, hoist failure, outrigger or roof hook moves)
- Outrigger beam tipping
- Lifeline failure
- Overloading or uneven load (tipping, one end dropping)
- Wind, sway and impact against the building
- Weather: storms, lightning, snow, ice
- Power lines
- Welding current through suspension ropes
- Heat, acids or corrosives on ropes
- Falling tools and materials
- Rigging crew at the roof edge
- Hands caught in hoists or ropes
- Electrical shock from powered hoists
- Gasoline exhaust and fire
Required PPE
- Full-body harness (no body belts for fall arrest), fitted to the wearer.
- Rope grab compatible with the lifeline diameter and type, and an energy-absorbing lanyard of the length the rope grab manufacturer allows.
- Independent vertical lifeline, one per worker, with edge protection.
- Suspension relief straps on the harness (site rule).
- Hard hat with chin strap (site rule).
- Safety glasses; face shield or goggles for chemical cleaning or grinding.
- Gloves suited to the task (chemical-resistant for cleaners and coatings).
- Safety footwear with slip-resistant soles.
- High-visibility apparel for ground and roof crew near traffic.
- Respiratory protection if coatings, solvents or dust require it (per SDS and the employer's respiratory program).
Key Procedure Steps
Set-up (roof)
- Review the rigging design with the competent person.
- Rigging crew puts on fall protection per SWP-004 before working within reach of the roof edge.
- Barricade the drop zone at ground level before anything is lowered over the edge.
- Place outrigger beams, roof hooks or parapet clamps per the design: on bearing blocks or a surface able to take the load, perpendicular to the face, stop bolts or shackles in place.
- Fit purpose-made counterweights and secure them mechanically, or make the direct connection.
- Fit tiebacks from each support device to a structural member: perpendicular to the face, or as an opposing pair.
- Hang suspension ropes.
- Rig one independent lifeline per worker to a separate structural anchorage.
Set-up (ground)
- Assemble the platform per the manufacturer.
- Reeve the hoists.
- Competent person does the pre-shift inspection and signs it off.
- Check wind speed and the forecast.
Work
- Each worker puts on and inspects the harness, attaches the rope grab to their own lifeline, and connects the lanyard before stepping onto the platform.
- First lift of the shift: raise the platform just clear of the ground, no higher than about 12 in (300 mm), with the full working load.
- Raise and lower both ends together.
- Keep the load spread out and within limits.
- Do not lean over or stand on guardrails, and do not use ladders, boxes or buckets to gain height.
- Pass from one platform to another only when both are at the same height, abutting, and fitted with walk-through stirrups made for it.
- Check wind during work.
- Never disconnect from your lifeline while on the platform.
Close-out
- Lower the platform to the ground or a safe landing.
- At the end of the day, secure the platform at grade or at a safe landing so wind cannot swing it, and isolate power to the hoists.
- When dismantling, remove the platform and ropes before counterweights; counterweights stay on the beams until the scaffold is dismantled.
- Inspect, clean and store harnesses, rope grabs and lifelines.
- Remove the barricade only when nothing can fall.
Each step is shortened to its first sentence. The full procedure, with every condition, checklist and sign-off field, is in the PDF.
Training Requirements
- Platform worker: Training by a person qualified in suspended scaffolds: electrical, fall and falling-object hazards; fall protection and falling-object systems in use; proper use of the scaffold and handling materials on it; maximum intended load and capacities; rescue plan.
- Worker who rigs, moves, operates hoists, repairs, maintains or inspects: As above, plus training by a competent person in: scaffold hazards; correct procedures for erecting, dismantling, moving, operating, repairing, inspecting and maintaining this type of scaffold; design criteria, maximum intended load and intended use.
- Competent person (US) / qualified person (Canada federal): Knowledge, training and experience in suspended scaffold rigging, inspection and the manufacturer's manuals for this equipment; appointed by the employer.
- Rescue person / team: Trained on the rescue method and equipment in the plan for this drop; first aid and CPR.
- Permanent powered platforms (US 1910.66): Operators proficient on the particular platform; trained by a competent person; certification record kept.
Regulatory References
- US OSHA 29 CFR 1926 Subpart L: 1926.450 (definitions), 1926.451 (general requirements, incl. (a) capacity, (d) suspension scaffolds, (f) use, (g) fall protection, (h) falling objects), 1926.452(o) and (p) (single-point and two-point adjustable suspension scaffolds), 1926.454 (training).
- US OSHA 29 CFR 1926.502(d) (personal fall arrest systems).
- US OSHA 29 CFR 1910.28(b)(12) (general industry scaffolds follow 1926 Subpart L), 1910.140 (personal fall protection), 1910.66 (powered platforms for building maintenance), 1910.27 (rope descent systems).
- US OSHA 29 CFR 1904.39, Reporting fatalities, hospitalizations, amputations and losses of an eye.
- Canada: COHSR SOR/86-304, Part II s. 2.16 (window cleaning anchors and permanent suspended platforms), Part III ss. 3.3 to 3.10 (temporary structures and scaffolds), Part XII ss. 12.05 to 12.09, 12.2, 12.21 (fall protection, training, records), Part XV (reporting) (federally regulated workplaces).
- CSA Z271 (suspended platforms), CSA Z91 (window cleaning), CSA Z259 series, ANSI/IWCA I-14.1 (window cleaning). Named only; check the edition your jurisdiction requires.
- Provincial OHS regulations. Use the one for your province.
Download the Full PDF Template
Get the complete Suspended Access Equipment / Swing Stage document as a fillable PDF, part of the Safe Work Procedures Template Pack.
Get This SWP + 4 More Free
Choose from 112 procedures. No credit card, no commitment.
Pick Your 5 Free SWPsWant Digital Sign-Off for Your SWPs?
Make Safety Easy lets your crew acknowledge procedures on any device. Track who read what, when. No more lost paper forms.
Start Your Free Trial